BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Foster City, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of May 19, 2022, project was awarded to Spencon Construction, Inc but awarded amount is not yet determined** The work consists of furnishing all labor, materials, equipment and services necessary to complete the removal and replacement of concrete sidewalks, curbs and gutters, driveways, curb ramps, curb inlets, asphalt concrete pavement tie-in, and miscellaneous concrete repairs as may be requested within the City of Foster City on an as needed basis during the term of the contract. All work shall include necessary traffic control. The locations of work will be throughout the City. Concrete replacement shall be completed within thirty (30) calendar days from commencement of work. Work shall commence within fourteen (14 calendar days) of notification by the City The City reserves the right to add or delete any identified work. All work performed shall be measured and paid based on the contract unit prices identified in the proposal schedule. The unit prices shall not be subject to change based on the addition or deletion of work. Questions regarding bonds and insurance may be directed to Andra Lorenz, (650) 286-3215 . All other inquiries regarding the Project should be directed to Greg Baeza . Once work is started on any given work order, work must be completed within thirty (30) calendar days. For each calendar day in excess of the time specified for completion of the work, the Contractor shall pay to the City, or have withheld from monies due, the sum of $ 100.00 (One Hundred and 00/100 Dollars) per calendar day until the work is complete. If the Project involves an expenditure in excess of twenty-five thousand dollars ($25,000), the successful Contractor must file a payment bond with and approved by Owner prior to entering upon the performance of the Work, in accordance with Civil Code Section 9550, et seq. If your Contract Sum exceeds (or is expected to exceed) $25,000, deliver to Owner one original Construction Performance Bond in form attached to Document 00 5205 as Appendix D, executed by you and your surety. The City reserves the right to reject any or all proposals, and to waive any irregularities in the proposals received.

Award

Sidewalks / Parking Lot

$300,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
84
Bidding Soon
1,699
All Active Projects
733
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

May 12, 2022

img_map_placeholder

Multiple Locations, Foster City, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.