BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Cranberry Lake, New York. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Site work and new construction of a pre-engineered storage facility in Cranberry Lake, New York. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility. Provide Salt Storage Building- Cranberry Lake - Construction Work Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $32,700 for C and $7,700 for E). MBE Goals: C Trade: 5% E Trade: 0% WBE Goals: C Trade: 5% E Trade: 0% SDVOB Goals: C Trade: 3% E Trade: 0% All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $500,000 and $1,000,000 for C and between $50,000 and $100,000 for E. Pursuant to Public Buildings Law 8(6), effective January 11, 2020, for any projects where the project design commenced on or after January 1, 2020 and for any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,400,000 or less, as adjusted annually for inflation beginning January 1, 2020. If more than one responsible and reliable MWBE firm meets these requirements, the MWBE firm with the lowest bid will be deemed the apparent low bidder. Phone the office of Megan Miller (315-960-1229) a minimum of 48 hours in advance of the date to provide the names of those who will attend the pre-bid site visit. Only contractors that schedule a visit at least 48 hours in advance will be allowed to participate in the pre-bid site visit. The substantial completion date for this project is 167 days after the Agreement is approved by the Comptroller. The Office of General Services reserves the right to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$100,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
23
Bidding Soon
446
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2022

May 13, 2022

img_map_placeholder

7045 NY-3, Cranberry Lake, NY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.