Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2022 at 8:00 PM
Updated October 24, 2023
Demolition, site work, paving and new construction of a bridge / tunnel in Mineral Point, Wisconsin. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Solicitation ID: SW-04 Anticipated Construction Cost: $1,000,000-$1,999,999 The structure needs to be replaced. Rehabilitation project for replacement of B-25-250 on STH 39 in Iowa County. This is the replacement of the 3-span steel deck girder bridge over Mineral Point Branch of the Pecatonica River. It also includes the reconstruction of the bridge approaches. Overall project length is approximately 0.302 miles. Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Interviews will not be conducted. The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Edmund - Mineral Point *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Bridges / Tunnels
$2,000,000.00
Public - State/Provincial
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 18, 2022
WI-39, Mineral Point, WI
Related To This Project
Mineral Point, WI
Bid Date: Jan 23 2020
Mineral Point, WI
Bid Date: Aug 04 2022
Mineral Point, WI
Bid Date: Aug 09 2022
Mineral Point, WI
Bid Date: Feb 09 2023
Mineral Point, WI
Bid Date: Apr 05 2023
Mineral Point, WI
Bid Date: Jul 27 2023
Mineral Point, WI
Bid Date: Aug 24 2023
Mineral Point, WI
--
Mineral Point, WI
Bid Date: Nov 10 2020
Sun Prairie, WI
--
Madison, WI
Bid Date: Apr 27 2022
Madison, WI
Bid Date: Apr 27 2022
Appleton, WI
Bid Date: Mar 15 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
