BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and outdoor lighting for a transportation facility in Pendleton, Oregon. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

Est. Value Notes: $4.5M and $5.5M. The CITY OF PENDLETON is seeking a qualified contractor to construct the Runway 29 Threshold Relocation, New Taxilanes and Apron Rehabilitation project. Major elements of work for the project include Relocation of the Runway 29 Threshold, construction of two new Runway 29 connector Taxiways, associated Medium Intensity Runway Lighting (MIRL) and Runway 29 and taxiway signage improvements, Runway 29 Precision Approach Path Indicator (PAPI) relocation and replacement, Runway 29 REIL relocation and replacement, and associated electrical improvements, excavation and site grading of runway and taxiway shoulder and safety areas, and associated drainage improvements. This project also includes the construction of four new hangar taxilanes, full depth rehabilitation of three existing hangar taxilanes, and rehabilitation (asphalt overlay) of existing apron pavements, associated drainage improvements, and associated taxilane shoulder and safety area grading. This contract is for a public works project subject to Oregon Bureau of Labor and Industries (ORS 279C.800 to 279C.870) and the Davis-Bacon Act (40 U.S.C. 3141, et seq). The Bidder must agree that the requirements and conditions of employment be observed and minimum wage rates, as established by the U.S. Secretary of Labor, or the Oregon Bureau of Labor and Industries, including any appropriate amendments. The contractor shall pay the state or federal prevailing wage rate, whichever is higher, and the most stringent requirements under this contract. No bid for a construction contract shall be received or considered by CITY OF PENDLETON unless the Bidder is registered with the Construction Contractors Board as required by ORS Chapter 701, or licensed by the State Landscape Contractors Board as required by ORS 671.530. Contractors must be qualified in accordance with ORS 279 and other applicable sections of the Oregon Revised Statutes in order to enter into a Contract with the Owner for public work in Oregon. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Transportation Terminals

$4,652,766.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
16
Bidding Soon
270
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

August 1, 2022

Project location map

2016 Airport Rd, Pendleton, OR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.