BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Southlake, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The cost estimate is $1.35M for the water line portion and $280K for the sidewalk portion of this project. Questions regarding distribution of Contract Documents and design related questions for this project shall be directed to Baird, Hampton & Brown ( Lindsay Lafferty at llafferty@bhbinc.com.. Email questions to Lindsay Lafferty at llafferty@bhbinc.com. All questions concerning this project shall be submitted by 5:00 PM on Wednesday, February 22nd, 2023. Any questions submitted after this time and date will not be addressed. This project generally consists of constructing approximately 1,874 LF of 12" PVC water main pipe by open trench construction and approximately 1,970 LF of 12" PVC water main pipe by trenchless construction methods. This project also provides for the looping of a small section of 8" water main to an existing 6" water main. Additionally, this project includes the construction of approximately 2,761 SY of 4" thick concrete sidewalk in the parkway as Bidders must submit a cashier's check, certified check, or acceptable bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the Owner within ten (10) days of Notice of Award of the contract. The security must be payable to the City of Southlake in the amount of five percent (5%) of the bid submitted. Contractor must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents. Contractors for this Project must pay no less than the prevailing wage rates for the area established by the Owner and included in the contract documents. Performance, Payment and Maintenance Bonds, bound to the City of Southlake are required, each in an amount of not less than one-hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials.

Post-Bid

Water / Sewer

$1,320,000.00

Public - City

Paving, Site Work

11

5

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
96
Bidding Soon
3,611
All Active Projects
1,420
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.