Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Perry, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Counties: Taylor Road Name: SR 30 (US 98) Limits: From Cabbage Grove Rd to Us 19 Project(s): 44331115201(*) Federal Aid No: D221063B Total Roadway Length: 12.829 Miles Contract Days: 220 Total Bridge Length: 0.028 Miles Total Proposal Length: 12.857 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, shoulder barrier wall, rumble striping, drainage improvements, highway signing, guardrail, sidewalks and other incidental construction on SR 30 (US 98) in Taylor County from Cabbage Grove Road to US 19. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 004 Resurfacing General: Remove the existing raised pavement markers (RPMs) before milling. Include the cost of removing existing RPMs in the price for milling. When milling to improve rideability or cross slope, remove the existing pavement to the average depth specified in the Plans, in a manner that will restore the pavement surface to a uniform cross-section and longitudinal profile. The Engineer may require the use of a stringline to ensure maintaining the proper alignment. Establish the longitudinal profile of the milled surface in accordance with the milling plans. Ensure the final cross slope of the milled surface parallels the surface cross slope shown in the Plans or as directed by the Engineer. Establish the cross slope of the milled surface by a second sensing device near the outside edge of the cut or by an automatic cross slope control mechanism. The Plans may waive the requirement of automatic grade or cross slope controls where the situation warrants such action. Operate the milling machine to minimize the amount of dust being emitted. The Engineer may require prewetting of the pavement. Provide positive drainage of the milled surface and the adjacent pavement. Perform this operation on the same day as milling. Milling operations are restricted to only that area which can be milled and resurfaced with the first lift of asphalt within the same work operation and prior to opening to traffic. Before opening an area which has been milled to traffic, sweep the pavement and gutters with a power broom or other approved equipment to remove, to the greatest extent practicable, fine material which will create dust under traffic. Sweep in a manner to minimize the potential for creation of a traffic hazard and to minimize air pollution. Do not sweep or allow milled asphalt into inlets. Sweep the milled surface with a power broom before placing asphalt concrete. In urban and other sensitive areas, use a street sweeper or other equipment capable of removing excess milled materials and controlling dust. Obtain the Engineer's approval of such equipment, contingent upon its demonstrated ability to do the work. Perform the sweeping operation immediately after the milling operations or as directed by the Engineer.
Award
Roads / Highways
$8,657,266.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2022
May 6, 2022
FL-30, Perry, FL
Related To This Project
Perry, FL
Bid Date: May 27 2022
Perry, FL
Bid Date: May 27 2022
Perry, FL
Bid Date: May 26 2022
Perry, FL
Bid Date: Jul 15 2022
Perry, FL
--
Perry, FL
Bid Date: Jul 07 2022
Perry, FL
Bid Date: Nov 18 2020
Perry, FL
Bid Date: May 09 2022
Deerfield Beach, FL
Bid Date: May 12 2022
Jacksonville, FL
Bid Date: Apr 27 2022
Jacksonville, FL
Bid Date: Apr 12 2022
Sanford, FL
Bid Date: May 12 2022
Pensacola, FL
Bid Date: Apr 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.