BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Spanish Fort, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 24, 2022, project was awarded to Asphalt Services, awarded amount is $3,929,977.77** Council Chambers for: CID Hwy 181 Eastern Shore Center Roadway Improvements This project consists of rehabilitation of roadway of approximately 1.4 miles of roadway; work includes approximately 19,000 CY of Unclassified Excavation, 44,000 SY Aggregate Base Course and 8,000 TONS of Bituminous Concrete Pavement. A total of two hundred (200) working days will be allowed for completion of work. All Bidders must file with their bids either a cashier's check drawn on an Alabama bank or a bid bond executed by a surety company duly authorized and qualified to make bonds in the State of Alabama and made payable to the Cooperative District of the City of Spanish Fort Hwy 181 Public Facilities in the amount of five (5%) percent of the Contractor's bid but in no event more than $10,000, and shall have a current State of Alabama General Contractors License. A Performance Bond and Payment Bond must be executed upon award of the bid with a penalty equal to one hundred (100%) percent of the amount of the contract price. Furthermore, any Contractor that desires to bid as prime Contractor must have at least one of the following major classifications of license per Section 230-X-.27 of the State of Alabama Licensing Board for General Contractors Administrative Code: a) Highways and Streets b) Municipal and Utility c) Heavy and Rail Construction If awarded the bid and prior to beginning work, the Contractor is required to have a current City of Spanish Fort Business License, furnish a Certificate of General Liability Insurance and Workers Compensation Insurance, and proof of Automobile General Liability Insurance. Insurance Certificate provided to the CID-Hwy 181 shall list the CID-Hwy 181 and the City of Spanish Fort as an additional insured. If the successful bidder's award amount is $50,000.00 or greater, a background check will be performed per CID-Hwy 181 General Conditions. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must provide evidence by including a copy of his or her current license in the sealed envelope in which the proposal is delivered. The CID-Hwy 181 reserves the right to accept or reject any or all bids and to waive technical errors if, in the CID-Hwy 181's judgment, the best interests of the CID-Hwy 181 will thereby be promoted.

Award

Roads / Highways

$3,929,978.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
39
Bidding Soon
492
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

May 30, 2022

img_map_placeholder

AL-181, Spanish Fort, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.