Site work for a water / sewer project in Santa Ana, California. Completed plans call for site work for a water / sewer project.

This work is for the rehabilitation of the existing Well 32 located at Morrison Park and includes construction at the following three locations: Morrison Park; within the city street rights-of-way along Westwood Avenue, Memory Lane, and Bristol Street; and at the John Garthe Reservoir site. At Morrison Park, the work includes: the demolition of the existing underground well vault, valves, piping and facilities; raising the well pump structure to grade, including associated well casing, column and appurtenances; new above ground well building with a pump and electrical room, including well pump/motor, well discharge and well to waste valves and piping; yard piping; site improvements, irrigation and landscaping improvements; and the Morrison Park improvements consisting of the repair and resurfacing of the basketball/ tennis courts, replacement of the tennis court fence enclosure, and replacement of the court lighting and corresponding electrical facilities. The well building will be constructed of CMU walls on a concrete pad with a flat roof (with a parapet) and will include the corresponding mechanical, electrical, instrumentation and control facilities. Within City Street rights-of-way, the 12-inch well discharge piping, with parallel fiber optic facilities, will be constructed from the well site at Morrison Park to the John Garthe Reservoir site. The alignment is approximately 3,700 LF and includes removal/replacement of an existing pipe within an existing bridge cell for approximately 100 LF. Supports, thrust restraints and attachments to the bridge as well as the necessary pipeline appurtenances, pavement replacement and necessary traffic control are a part of this scope of work. At the John Garthe Reservoir site, the work includes construction of a chemical building/restroom facility and associated on-site piping, including pressure control and chemical injection vaults. The proposed chemical building will house the City's standard disinfection system (sodium hypochlorite generation equipment). The building will be constructed of CMU walls on a concrete pad with a gabled roof including the corresponding plumbing, mechanical, electrical, instrumentation and control facilities. In addition, electrical upgrades to the John Garthe Pump Station are a part of this scope of work at this site. Online Q&A Yes Q&A Deadline April 19, 2022, 4:00 PM (PDT) Bid Valid- Minimum 90 Days Liquidated Damages - $5,800.00/Day Type of Award - Lump Sum

Award

Water / Sewer

$12,795,865.00

Public - City

Site Work

Subscribe For Documents

96 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
110
Bidding Soon
2,369
All Active Projects
1,053
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

March 29, 2023

img_map_placeholder

2801 N Westwood Ave, Santa Ana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.