BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Cedar Hills, Utah. Working plans call for site work for a playground / park / athletic field.

Q&A Deadline: Friday, April 1 at 1 PM (MDT) Expand the footprint of the main north parking lot, add ADA parking options, and reroute the Forest Creek trail to provide better functionality at the existing park. The proposed parking improvements were designed by Bowen Collins & Associates. The Question and Answer period closes on date and time specified on this RFP and in U3P. All questions must be submitted in writing to Charl Louw through the U3P portal during the Question and Answer period. He will work with the engineer and landscape architect to respond to the questions. The Questions and answered will be compiled into one document and posted in the U3P portal after the Question Cut-off date and time. Questions may include notifying CEDAR HILLS of any ambiguity, inconsistency, scope exception, excessively restrictive requirement, or other errors in this RFP. Questions are encouraged. Questions may be answered individually or may be compiled into one document. An answered question or an addendum may modify the specification or requirements of this RFP. Answered questions and addenda will be posted in U3P. Vendors should periodically check U3P for answered questions and addenda before the proposal closing date. It is the responsibility of the Vendors to submit their proposals as required by this RFP, including any requirements contained in an answered question and/or addenda. There is also a short connecting concrete path between parking lot and the new trail. Except where permitted under this policy or provisions for competitive sealed proposals, the contract is to be awarded to the highest scoring, responsive proposal based on the evaluation criteria set forth in the request for proposals, subject to the terms of this policy. No proposal shall be evaluated for any requirements or criteria that are not disclosed in the request for proposal. Awarded projects not completed within the agreed timeframe will be fined $500 day and the total fines will be deducted from agreed upon price. Offeror must include a complete cost proposal in their proposal. If an Offeror fails to include a complete cost proposal, then its proposal will be considered non-responsive and the proposal will be rejected.

Final Planning

Playgrounds / Parks / Athletic Fields

$247,000.00

Public - City

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
32
Bidding Soon
516
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

November 4, 2022

img_map_placeholder

4425 W Cedar Hills Dr, Cedar Hills, UT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.