BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Irving, Texas. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of 4/20/2022, bids are being evaluated. Timeline for award has not been established. The work to be performed under this contract consists of furnishing all concrete, steel, appurtenances, tools, equipment, labor and incidentals necessary to remove and install complete in place approximately 1 mile of a six lane divided roadway, turn lanes, sidewalk with ADA ramps, replacement of two street light foundations, irrigation system modifications and repairs, together with all associated appurtenances to complete this project in the City of Irving. The Contractor shall utilize existing City right-of-way or easements to stockpile equipment and materials for the construction of the project. If additional space is required beyond the limits of existing City right-of-way or easements, the Contractor shall obtain the permission of all impacted private property owners. The Contractor shall have all applicable private property owners complete the attached "Temporary Stockpile of Construction Materials and Access on Private Property" form letter. The Contractor shall submit all wet signed original form letters to the City's Engineering Inspector prior to the use of any private property. The Contractor shall be required to furnish a water meter for metering all water used on this project. The Contractor shall pay for all water used on this project directly to the City of Irving Water Department when the job is completed and before final acceptance by the Engineering Department. During Irving stage 2 water restrictions, the contractor may not be allowed to obtain water from fire hydrants along the project, but rather be directed to obtain water from specified locations within the City of Irving. Permit will be required to use City of Irving water during stage 1, 2, or 3 water restrictions and is attached. Cost range is between $5M and $10M. Probable cost of construction estimate $8M.

Post-Bid

Roads / Highways

$8,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

60

12

8

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
65
Bidding Soon
3,533
All Active Projects
1,404
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.