BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Creighton, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnish all equipment, labor, materials and appurtenances required to apply approximately 67,350 S.Y. of chip seal. Aggregate is to be provided by the Owner. There are bids for two asphalt types; MC-3000 and CRS-2P. There are bids for two asphalt types; MC-3000 and CRS-2P. This bid also includes other such work as may be incidental to 2022 CHIP SEAL. GENERAL - Work included in this contract shall conform to the requirements of the 2017 Edition of the Nebraska Department of Transportation Standard Specifications for Highway Construction and the following Detailed Specifications. The Detailed Specifications supersede the Standard Specifications when conflicts exist. PATCHING - Any necessary patching will be performed by the Owner. The Contractor will not be required to perform any patching of the existing street surfacing. CHIP SEAL, APPLIED - This item will include preparing the roadway surface, furnishing and applying the liquid asphalt, loading, transporting, and applying the aggregate, rolling the aggregate, and all incident work necessary to perform the work in compliance with the Standard Specifications and these Detailed Specifications. LIQUID ASPHALT - Section 515 of the NDOT Standard Specifications is amended to include MC-3000 as an option for the liquid asphalt.The liquid asphalt for Bid Schedule A shall be Type MC-3000. The liquid asphalt for Bid Schedule B shall be Emulsified Asphalt Type CRS-2P. The Contractor shall furnish the Owner with documentation of the quantity of liquid asphalt used (Bill of Lading, Scale Tickets, Etc.) to verify the application rate. No measurement or payment will be made for liquid asphalt. This work will be considered subsidiary to Chip Seal, Applied. COMPLETION DATE/LIQUIDATED DAMAGES - The required completion date for all work is September 27, 2022. If all work is not completed by the required completion date, the Contractor will be assessed liquidated damages in the amount of $500 for each calendar day after the completion date.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
1
Bidding Soon
125
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

June 6, 2022

img_map_placeholder

Multiple Locations, Creighton, NE

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.