BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Hector, Arkansas. Completed plans call for the renovation of a 3,375-square-foot, two-story above grade educational facility.

BID PACKAGES 01Demolition 02Concrete 03Masonry 04Structural and Miscellaneous Steel - Materials Only 05Carpentry 06Architectural Cabinets 07Doors, Frames, and Hardware including Specialties - Materials Only 08Doors, Frames, and Hardware including Specialties - Installation Only 09Glass and Glazing 10Metal Studs, Gypsum Board, Acoustical Ceilings, and Insulation 11Floor Covering and Wall Base 12Painting 13Plumbing and Gas Piping 14Heating and Ventilation System 15Electrical and Communications NOTE: All subcontractors are required to comply with the Davis-Bacon Act Prevailing Wage Rates. See Section 004 of the Construction Manual. PROCESS FOR SUBMITTING BIDS Refer to the Instructions to Bidders section in the Construction Management Manual for directions on submitting bids. Bids must be based on a lump-sum amount and must be inclusive of all bid package requirements. Bids will be opened publicly. Include on sealed bid proposal envelope the name of the project and bid package number. If submitting for more than one package, then each bid for each package must be in separate sealed envelopes. Faxed bids are also acceptable. Please send faxed bid to 479-968-2570 or email to dbrown@vanhornconstruction.com. All bidders must be licensed in the State of Arkansas, as provided by Act 142 of 1967, amended by Act 293 of 1969, and Act 397 of 1971, and Act 546 of 1971, as enacted by the General Assembly of the State of Arkansas. Successful bidders providing a complete, responsive, and responsible bid will be required to execute a Subcontract with Van Horn Construction, Inc. which is available for review in the Construction Management Manual. Additionally, bidders must be prepared to provide insurance as specified in the Construction Management Manual. Bidders must comply with regulatory and licensing requirements of the State of Arkansas as well as all other applicable State statutes. To be considered, bidders must be licensed on day of bid opening. By providing a bid, firms accept the obligation to honor bids for a period of 60 days after the bid openings. Subcontractors attention is called to the Owner's requirement of mandatory background checks of all employees who will physically be on the Owner's property. Please list on your bid proposal the number of employees you will have on site to complete the project. VHC will cover the cost for this listed number. If any additional employees are used, it will be at Subcontractors expense. The Owner and Construction Manager reserve the right to reject any or all bids, based on availability of funding, to waive formalities in the bids received, to evaluate bids, and to accept any bid or bids which, in their opinion, may be in the best interest of the Owner. BID GUARANTEE AND PERFORMANCE BONDS Each bid will include a bid bond in the amount of 5% of the total bid offered payable to Van Horn Construction, Inc., if bid exceeds $50,000. It will be in the form of a cashier's check or insurance surety bond using AIA Document A310 with Power of Attorney attached. Bond is to be made payable to Van Horn Construction, Inc. A "Performance and Payment Bond" or a "Material Supply Bond" in the amount of 100% of the total amount of the bid, will be furnished by the successful bidder if exceeding $50,000, within ten (10) days after receipt of the Owner's, referred to in this specification, intent to award notice. Failure to furnish the required bonds may cause forfeiture of bid guarantee to the owner as liquidated damages. The "Performance and Payment Bond" or the "Material Supply Bond" will be in the amount equal to 100% of the contract price as security for the faithful performance of this contract price and for payment of all indebtedness for labor and materials furnished or performed in connection with this contract. The bond will be written by a surety company which is qualified and is authorized to do business in the State of Arkansas, according to A.C.A. 22-9-402(a)(b) and filing with said bond, his power of attorney as his authority. The bond will be written in favor of the Construction Manager and executed per Arkansas state law. An original and two (2) copies of the bond must be furnished, with power of attorney attached to each. PN - 222015

Post-Bid

Educational

$400,000.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
56
Bidding Soon
702
All Active Projects
284
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 14, 2022

May 16, 2022

img_map_placeholder

AR-27, Hector, AR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.