BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Gallatin, Tennessee. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

As of June 16, 2022, the project was awarded to Biscan Construction, but no awarded amount is not available. https://www.asumag.com/planning-design/new-construction/article/21243929/sumner-county-tenn-board-votes-to-approve-construction-of-new-372-million-liberty-creek-middle-school The Sumner County (Tenn.) school board has approved construction of a $37.2 million middle school. The 125,000-square-foot Liberty Creek Middle School will be similar in design and size to the district's Knox Doss Middle School, reports The Hendersonville Standard. The middle school will be built on a campus in Gallatin that already is home to a high school and elementary school set to open this summer. Funds for the project come from a $52.2 million bond issue voters approved in March 2021. The school is set to be completed in August 2024. Robert Biscan & Company is the construction manager andKatz, Binkley, Jones & Morris is the architect. _______________ Project Number- 21-118-01, 22532 5% Bidders Bond is required. Performance Bond and Payment Bond in the full amount of the bid will be required. All bidders must be licensed Contractors as required by the Contractors Licensing Act of 1976, as currently amended. Project Number- 21-118-01, 22532 5% Bidders Bond is required. Performance Bond and Payment Bond in the full amount of the bid will be required. All bidders must be licensed Contractors as required by the Contractors Licensing Act of 1976, as currently amended. Incidental work Included (but not limited to) 1. Verification of correct location of electrical receptacles, telephone outlets, computer outlets, and similar outlets to suit furniture, equipment, and casework arrangement. 2. Verification of correct location of plumbing and HVAC services and waste lines to suit equipment and casework arrangement 3. Installation of conduit, outlet boxes with finished covers and terminal cabinets for telephone system. 4. Site improvement as indicated C. Earthwork (including but not limited to) 1. Clearing and Grubbing as necessary 2. Demolition of all existing improvements except where noted otherwise 3. Removing, adjusting, and/or salvaging existing utilities and improvements as required to complete project. 4. Excavate and stockpile topsoil and usable fill material 5. Compaction of underlying surface, Undercut as necessary 6. Locate and furnish any required borrow material 7. Replace topsoil as required 8. Construct and backfill storm sewer system. 9. Construct utilities a. Provide safe temporary closures on water line stubs to withstand water pressures if the line is pressurized 10. Construct curb and gutter. 11. Construct subgrade, base pavement, striping, and all components of pavement 12. Traffic control and barricades to maintain traffic during construction 13. Installation of erosion and sediment control measures including grassing 14. Miscellaneous other Work and incidental Work 15. Coordinate and perform any utility relocations due to conflicts

Award

Educational

$30,000,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
87
Bidding Soon
1,116
All Active Projects
487
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 27, 2022

June 27, 2022

March 31, 2024

img_map_placeholder

100 Albert Gallatin Ave, Gallatin, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.