BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Mound, Minnesota. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Expected Award Date:05/03/2022 Project Start Date:08/16/2022 Construction Start Date:08/16/2022 Construction End Date:10/31/2022 The bids will be considered by the County Board of Commissioners on May 3, 2022, for the following improvements: 1 LS Mobilization 0.5 ACRE Clearing & Grubbing 124 LF Remove Pipe Culverts 656 LF Remove Fence 9,774 CY Excavation - Common (P) 9,724 CY Common Embankment (CV) (P) 1,210 TON Aggregate Surfacing and Base 160 TON Type SP 12.5 Wearing Course Mix (2,B) 156 LF Type S (TL-4) 36" Barrier Concrete (3S52) 57 CY Structural Concrete (3B52) (P) 22,900 LB Reinforcement Bars (Epoxy Coated) (P) 1 LS Structure Excavation 1 LS Slope Preparation 2,418 SF Bridge Slab Concrete (3YHPC-M) (P) 8 EACH Elastomeric Bearing Type 1 (P) 305 LF Prestressed Concrete Beams 36M (P) 25 EACH Diaphragms for Type 36M Prestressed Beams 1 LS Remove Existing Bridge 300 CY Structural Backfill (P) 2 EACH C-I-P Concrete Test Pile 50 FT Long 12" 10 EACH Pile Points 12" 320 LF C-I-P Concrete Piling 12" 4 EACH 18-24" GS Pipe Apron 126 LF 18-24" CS Pipe Culvert 1 LS Drainage System Type (B910) 1,090 LF 6" Perforated PE Pipe Drain 329 CY Random Riprap Class III 1 LS Traffic Control 1 LS Stabilized Construction Exit 1 LS Erosion Control Supervisor 2 EACH Culvert End Controls 1,376 LF Silt Fence, Type MS 200 LF Flotation Silt Curtain Type Moving Water 40 LF Filter Berm Type 5 665 LF Sediment Control Log Type Straw 2 HOUR Sediment Removal Backhoe 1.6 ACRE Subsoiling 1,100 LB Fertilizer Type 3 8,448 SY Rolled Erosion Prevention Category 20 3 ACRE Seeding 3 ACRE Disk Anchoring 140 LB Seed Mixture 25-142 3 TON Mulch Material Type 1 3 MGAL Rapid Stabilization Method 3 Bids must be accompanied by a corporate surety bond made in favor of Blue Earth County or a certified check made payable to the Blue Earth County Treasurer for 5% of the amount of the bid. Upon execution of the Contract, certified checks or bid bonds will be returned to the unsuccessful bidders within 30 days of the opening of the bids. The successful bidder will be required to furnish a Surety Bond. The Blue Earth County Board of Commissioners reserves the right to reject any or all bids or to waive defects.

Bid Results

Bridges / Tunnels

$701,732.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
51
Bidding Soon
784
All Active Projects
346
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

May 26, 2022

img_map_placeholder

County Rd 151, Mound, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.