Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Spencer, Indiana. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
As of Mach 7, 2023, construction is underway and expected to be completed by the end of May 2023, however, an exact timeline for construction has not been confirmed. This project includes but is not limited to the regionalization of McCormick's Creek State Park's wastewater system by discharging all wastewater into the neighboring Town of Spencer's wastewater system. The work includes construction of two (2) new wastewater lift stations, upgrades and replacements to two (2) existing lift stations, three (3) new grinder stations, a half-mile of new gravity sewer, approximately one (1) mile of new force main, approximately 1/3 mile of low pressure sewer, conversion of an aeration tank to an equalization basin, abandonment of the remainder of the Park's WWTP, abandonment of one (1) existing lift station, an INDOT highway crossing, installation of a flow meter and sampling station, site improvements, electrical work, erosion control, maintenance of traffic, bypass pumping, dewatering, pavement repairs, and all other work required for the complete regionalization project. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Additional questions concerning access to the website may be directed to Commonwealth Engineers, Inc. at (317) 888-1177 or email to jchipman@contactcei.com. MBE (7%), WBE (5%) *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Under Construction
Water / Sewer
$4,724,241.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2022
May 13, 2022
To Be Determined, Spencer, IN
Related To This Project
Spencer, IN
Bid Date: Apr 05 2022
Spencer, IN
Bid Date: Mar 13 2020
Spencer, IN
Bid Date: Apr 08 2021
Spencer, IN
Bid Date: Sep 07 2022
Spencer, IN
Bid Date: Aug 30 2022
Spencer, IN
Bid Date: Feb 10 2023
Spencer, IN
Bid Date: Jan 31 2023
Spencer, IN
Bid Date: Jul 12 2023
Spencer, IN
Bid Date: Dec 22 2022
Spencer, IN
Bid Date: Nov 15 2022
Spencer, IN
Bid Date: Nov 15 2022
Spencer, IN
Bid Date: Sep 19 2022
Boonville, IN
Bid Date: May 10 2022
Evansville, IN
Bid Date: May 25 2022
Pendleton, IN
Bid Date: May 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.