BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lawrence, Michigan. Completed plans call for site work for a water / sewer project.

The Van Buren Intermediate School District is now accepting bids for the replacement of two vertical sump pumps as outlined in the Specifications Direct all questions regarding said proposal to Randy Olds, Maintenance Supervisor, at (269) 539-5233 or rolds@vbisd.org. The Van Buren Intermediate School District reserves the right to accept or reject any or all bids, to waive any irregularities which it deems to be in the best interest of Van Buren Intermediate School District, and the right to award the contract to other than lowest bidder. The VAN BUREN INTERMEDIATE SCHOOL DISTRICT is soliciting competitive bids for the replacement of two vertical sump pumps in the Bert Goens Learning Center Building located at 705 South Paw Paw Street, Lawrence, Michigan 49064. Van Buren Intermediate School District is requesting proposals from companies who can provide services including mechanical services, plumbing, and controls for Building Supervisors. The company is responsible for all measurements and other details of this proposal. Responses to this request for proposal are an indication that the vendor has checked all aspects of this request. Removal and disposal of two existing failed pumps Replace each with vertical wastewater pumps equivalent to what is listed on the blueprints Re-connect to existing piping New duplex control panel in enclosure with two circuit breakers. two motor starters with overload protection, two selector switches, running lights, control circuit transform, alternator, high water alarm with silence control, high alarm dry contact Four float switches Provide and install new duplex sump covers with level control, pump openings, and vents PVC Schedule 80 PVC pipe, ball valves, check valves and fittings for discharge piping to existing PVC All-electric connections done by a certified electrician The startup, setting of float switches, and check operation Low voltage control wiring if needed All work to be performed on regular working hours Apply for any Consumers Energy rebates Mechanical permits

Award

Water / Sewer

$37,595.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
14
Bidding Soon
685
All Active Projects
258
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2022

May 11, 2022

img_map_placeholder

705 S Paw Paw St, Lawrence, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.