BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated October 11, 2024

Site work for a road / highway in Gilbert, Minnesota. Completed plans call for site work for a road / highway.

Project Category Code: Construction, Solar Energy Description: State Project No. 2022-160-02-8P445 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. No pre-bid meeting is scheduled. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Construct a 29.7 kw AC, Ground-Mounted Photovoltaic Array with Utility-Interactive Meter and All Associated Foundations, Equipment, Devices and Connectors.

Award

Roads / Highways

$242,176.00

Public - State/Provincial

Site Work

9

12

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
12
Bidding Soon
206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 16, 2022

Project location map

To Be Determined, Gilbert, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.