Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Salt Lake City, Utah. Completed plans call for the renovation of a educational facility; and medical facility.
Bids will be received by the University of Utah U Facilities for HCH PET CT REPLACEMENT Construction Budget: $50,000. Bids will be in accordance with the Contract Documents prepared by University of Utah U Facilities and BNA Consulting, hereinafter referred to as "A/E" as defined in the General Conditions. Construction services to prepare the room at the Center for Quantitative Cancer Imaging (CQCI) to receive new PET/CT equipment. The scope of the work includes Electrical modifications required to support new equipment. The second phase of the project (Room PET A650C0) may be issued at a later date. Effective September 10, 2018, the University has retired the previous state mandated Surety Bond Forms and is now requiring the use of the AIA Bid Bond Form A310-2010 and Performance and Payment Bond Form A312-2010. ALL QUESTIONS MUST BE UPLOADED at website. The Bid Form provided herein should be used for paper and electronic bid submittals. Should a bid be received on the Bid Form and electronically through BidSync, the electronic bid shall govern. All bidding documents and addenda will be distributed at website. The university is not responsible for difficulties, technical or otherwise, associated with the electronic bidding process. Bidders who choose to use the electronic bidding process do so at their own risk. Persons or companies bidding on this project shall hold a current Utah Contractor's License covering the type of work to be done and shall be bondable to the amount of the Contract. If the anticipated dollar amount is above $100,000 must be procured and submitted to the University of Utah within 24 hours after the bid due time. The bid bond may be scanned and submitted with the online bid via at the time of the bid. Q & A deadline: Apr 08, 2022 6:00:00 PM EDT. Proper ICRA barriers and negative air must be maintained in the construction area to contain construction dust and debris. -Vibration and noise causing activities must be coordinated and approved in advance with building management. -Any utility shutdown must be coordinated with the Hospital Emergency Management and Building Management team. After hours shutdowns may be needed. -Limited parking and staging area. The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University. The university of utah, u facilities, teressa pickett, contract administrator.
Post-Bid
Medical
$50,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2022
May 19, 2022
1950 Cir of Hope Dr, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
Bid Date: Apr 15 2022
Salt Lake City, UT
Bid Date: May 10 2022
Salt Lake City, UT
Bid Date: Apr 27 2022
Salt Lake City, UT
Bid Date: Apr 15 2022
Salt Lake City, UT
Bid Date: Apr 06 2022
Salt Lake City, UT
Bid Date: Mar 15 2022
Salt Lake City, UT
Bid Date: Mar 22 2022
Salt Lake City, UT
Bid Date: Mar 16 2022
Salt Lake City, UT
Bid Date: May 11 2022
Salt Lake City, UT
Bid Date: Mar 24 2022
Salt Lake City, UT
Bid Date: Mar 29 2022
Salt Lake City, UT
Bid Date: May 10 2022
Salt Lake City, UT
Bid Date: May 10 2022
Salt Lake City, UT
Bid Date: May 10 2022
Salt Lake City, UT
Bid Date: Apr 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.