BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility; and office development.

**As of May 10, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** This project entails the replacement of roofing and flashing systems, provision of metal wall panel cladding, limited masonry repairs, and associated work for the George White Building. The building was constructed circa early 1950's with the dairy bar portion added later. The roof was previously replaced in the late 1980's. The Project will conform to the 2018 Connecticut State Building Code and is defined as an Alteration Type 1 per the 2015 International Existing building Code. The work that will be required includes but is not limited to the following: o New roofing and flashing systems o Metal wall panel cladding o Masonry repairs o Removal and replacement of roof drain assemblies and partial leaders. Addition of one augmenting emergency overflow roof drain, leader, and wall outlet system. o Removal of unused or abandoned roof top mechanical units, fans, and other items. Cap resultant curbs with metal decking and replacement roof systems. o Temporary disconnect, raising, resetting, and reconnection of the existing roof top mechanical, electrical, plumbing and HVAC related equipment to facilitate roof replacement operations. o Removal and replacement of deteriorated portions of metal roof decking. Repair of surficial rust of metal roof deck that remains. o Mechanically fastening existing and replacement metal roof decking to FM Global and project specifications. o Protection of the public, building, grounds from damage during this contract is always the responsibility of the Contractor for this project. The construction is planned to start: OCTOBER 1, 2022 Construction duration: 4 MONTHS RFI Deadline Date 4/12/2022 2:00 PM Only On-Call $100K - $500K Roofing Contractors are prequalified and may submit a Bid for this Project. The "Set-Aside" Requirement for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. Liquidated Damages of $800.00 [EIGHT HUNDRED DOLLARS] per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion, or causes delay to the Substantial Completion of any portion of the work within the Contract Time. The University reserves the right to reject any or all Bids, in whole or in part, to award any item, group of items, or total bid; and to waive any informality or technical defects; if it is deemed to be in the best interest of the University.

Post-Bid

Office

$600,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
250
Bidding Soon
3,596
All Active Projects
1,580
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

October 1, 2022

img_map_placeholder

3636 Manter Rd, Storrs Mansfield, CT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.