Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Tucson, Arizona. Completed plans call for site work for a water / sewer project.
Pima County is seeking Statements of Qualifications (SOQ) for a Construction Manager at Risk (CMAR) to provide design/plan phase assistance, and complete construction services as the CMAR for the Canoa Ranch Sewer Extension project (3CRAEX). MICROSOFT TEAMS LINK: See Solicitation. DIRECT QUESTIONS IN WRITING TO: Denise Waldo, Procurement Officer E-mail: denise.waldo@pima.gov Pima County is seeking Statements of Qualifications (SOQ) for a Construction Manager at Risk (CMAR) for the Canoa Ranch Sewer Extension project (3CRAEX) located in southern Pima County near Green Valley. This project is being developed after a need for a new sewer collector line was identified. The location of the project starts at East Elephant Rd in close proximity to S I-19 and continues north where it will intersect an existing sewer collector line - approximately four (4) miles in length. This will include the underground installation of underground sewer facilities. Design will be completed in one phase while construction will be completed in two phases. Kimley Horn and Associates is the Design Professional for this project. The CMAR will work with and act as an integral part of the design team during the preconstruction phase of the project and is expected to provide constructability review and recommendations. Pima County anticipates completing construction of the project by the fall of 2023. The successful Construction Manager at Risk team will be selected through a qualifications-based selection process, with a negotiated fee for pre-construction services and, if determined by the Department, a negotiated GMP or multiple GMP's for construction This project consists of the installation of a new sewer collector system from the West Elephant Head Road and I-19 intersection north, approximately four miles. The current design is at roughly 30% with the alignment set with only minimal changes expected as design progress. Profile and installation depth are in design and final profile elevations will be determined through the CMAR/Designer collaboration. The construction phasing will be broken into two phases. See Attachment 1 to Appendix "A", Sewer Phasing Map (1 page). The first phase will connect to the exiting RWRD sewer facilities at the northern extents of the project location and continuing south past the future location of the Canoa Ranch Campground development located at approximately 5800 block of South I-19 Frontage Road. The intent in the order of phasing is to provide public sewer system access to the future Canoa Ranch Campground. The second phase of construction will begin at the termination point of Phase 1 and conclude at the current RWRD facilities located near the West Elephant Head and I-19 Frontage Road intersection. Phase two will conclude when the new sewer system is connected to the existing RWRD facilities at that location. Both phases of construction are anticipated to occur almost entirely within the AZ DOT Right of Way, although design developments may adjust the alignment. The project area includes numerous challenging cultural resources that may require archaeological mitigation. At this time, County believes this will be a challenge requiring consideration of culture aspects of the area and likely require site restoration as required by cultural regulators managing the resources in the project work area. Those requirements will be determined as design progresses
Post-Bid
Water / Sewer
$250,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock Winning Bids!
Elevate your business with the premier source for commercial construction data. Gain instant access to up to five free projects and companies, and discover a treasure trove of opportunities. Subscribe now for comprehensive access to all contacts, documents, and vital details, and set yourself up to win more business than ever before!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
April 20, 2022
July 25, 2022
Multiple Locations, Tucson, AZ
Related To This Project
Tucson, AZ
Bid Date: Oct 08 2021
Tucson, AZ
Bid Date: Jan 21 2022
Tucson, AZ
Bid Date: May 27 2022
Tucson, AZ
--
Tucson, AZ
--
Tucson, AZ
--
Tucson, AZ
Bid Date: May 25 2022
Tucson, AZ
Bid Date: May 25 2022
Tucson, AZ
--
Tucson, AZ
Bid Date: Mar 22 2022
Tucson, AZ
Bid Date: Mar 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--