BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Horizon City, Texas. Completed plans call for site work for a water / sewer project.

Engineer Estimate: $6,175,420,50 - $9,057,283.40 The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: Installing 7,100 linear feet of 36-inch Concrete Steel Cylinder waterline, 5,350 linear feet of 42-inch HDPE waterline, two 6-inch air release valves, one 8-inch air release valve, two 6-inch blow off valves, seven 36- inch gate valves, six 42-inch gate valves, 28,000 square yards of 2-inch HMAC, 1,040 cubic yards of 12- inch 2-SAC, trench safety, traffic control, video tape of project, corrosion control, cathodic protection, electrical tie-ins and other miscellaneous items to complete project. Questions Deadline: April 12, 2022 at 5:00 PM (MST) Engineer Estimate: $6,175,420,50 - $9,057,283.40 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Each Bid shall be submitted in accordance with the Instructions to Bidders and be accompanied by a Bid Security in the amount of five percent of the amount bid. The Successful Bidder states he or she must furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond, in accordance with the Instructions to Bidders and the General Conditions Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all immaterial, nonconforming, nonresponsive, unbalanced, or conditional Bids. Also, Owner reserves the right to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to the Bidder, whether because the Bid is not responsive or the Bidder is not responsible because the Bidder is deemed to be unqualified or of doubtful financial ability or fails to meet any other pertinent criteria established by Owner under Paragraph 3 hereof.

Post-Bid

Water / Sewer

$9,057,283.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
255
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2022

July 21, 2022

img_map_placeholder

Homestead Dr, Horizon City, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.