BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a playground / park / athletic field in Myrtle Beach, South Carolina. Completed plans call for the demolition of a playground / park / athletic field; for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Renovations include minor demolition, windows, interior work. Contractor will be responsible for renovations at Thunderbolt Park, located at 2290 Farrow Parkway, Myrtle Beach, SC 29577. Renovations will include the following: Demolish three (3) openings on the east side of the building to accommodate two (2) 80"x60" windows and one (1) 30"x60" window. Contractor is responsible for all project spoils. Install two (2) 80"x60" windows and one (1) 30"x60" window. Windows to be Kawneer brand, or approved equal. Windows must meet current ICB 2018 impact code. All windows must be both large missile and small missile impact rated. All glass to be low UV. All window frames must be bronze in color to match the existing building. All windows must be sealed to protect against weather elements. Install three (3) window lentils: two (2) lentils at 8-feet long and one (1) lentil at 3-feet long. Supply and install a 42-inch high L-shaped counter that is approximately twenty (20) feet in total length. Counter must have a swing door. Cabinet to be rough cut 1"x6" material. Counter top to be granite (color selected at a later date.) Construct an approximately 11-foot high wall (height to match existing wall.) Exterior of wall must be rough cut 1" x 6" material. Interior must be finished with sheetrock that has been spackled and sanded to a smooth finish. Wall will be painted, with color selected at a later date. In the new wall, install a 3' x 7' solid metal door with metal doorframe. Doorframe must be painted black. Construct a 4-foot high welding wire fence using 4-inch round post with top rail. Fence must be installed on top of the new and existing walls. Paint all new materials and repaired, including any/all areas damaged by demolition or construction with at least two coats of interior semi-gloss paint. There must be sufficient drying time between coats. Colors to match existing color scheme, to be selected by City project manager at a later date. Contractor will be responsible for all building code inspections. At their own expense, Contractor will be responsible to repair any/all damages to existing structure and features that are caused by the demolition and/or construction work.

Award

Playgrounds / Parks / Athletic Fields

$55,500.00

Public - City

Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
55
Bidding Soon
528
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

May 23, 2022

img_map_placeholder

2290 Farrow Pkwy, Myrtle Beach, SC

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.