BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work and paving for a bridge / tunnel in North Buffalo Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This Project is the Bridge Preservation Activities of the Existing Structure Carrying Us 422 Over the Allegheny River and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 422, Section 160, in Armstrong County North Buffalo and Manor Townships From Approximately the Start of the Existing Structure at Segment 0200 Offset 0096 to Approximately the End of the Existing Structure at Segment 0228 Offset 0736. This Project is the Lead Project to Companion Project 109622 Which Includes the Bridge Rehabilitation Activities of the Existing Structure Carrying Sr 66 and the Graff Bridge Ramp (Sr 8008) Over Us 422, Sr 2025, and Garretts Run and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 66, Section 158, in Armstrong County Manor Township From Approximately the Start of the Existing Structures at Segment 0414 Offset 2901 to Approximately the End of the Existing Structure at Segment 0430 Offset 1336 , and at Segment 0012 Offset 0000 to Approximately the End of the Existing Structure at Segment 0012 Offset 1970. DBE: 7% Project Cost Range: $50,000,000.00 - $59,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 86.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Graff Bridge Preservation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$45,607,928.00

Public - State/Provincial

Paving, Site Work

1014

18

127

6

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
68
Bidding Soon
1,427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 31, 2025

Project location map

US 422, North Buffalo Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.