BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in McMillan Township, Michigan. Completed plans call for site work for a bridge / tunnel.

The following projects will be awarded to one PSC under one contract, but monthly billings will need to provide tracking of hours per site and task. Individual cost portions for each site shall be provided with the RFP response. Surveying, Geotech, hydraulic analysis, permitting, etc. and other services and reimbursements under the control of the PSC may be linked and cover any multitude of sites, with billing apportioned and tracked per site as appropriate. For final design, bidding and construction administration services, the PSC should plan that the designs will be integrated into one bid package and bid under one construction contract, awarded to one contractor, and constructed under one construction contract. However, the possibility that some of the sites may be deductive alternates should not be discounted. The construction for all four (4) sites may span two (2) construction seasons. o Design and construction administration for replacement of the culvert with a culvert. o The location of this culvert is within state property and the creek is a designated trout stream. o The current culvert is an elliptical 5' x 4' x 34' corrugated metal pipe with an inflow end. o Camp 7 Road is a major road feeding private properties, including a church camp, with a lot of fall traffic and is a designated snowmobile trail. o The new crossing will require to be a log truck loading and snowmobile groomer capable. o If needed, the PSC shall include performing a hydraulic analysis of the stream to size the new culvert and for permitting, DNR has not done the analysis. o There is no existing survey or geotechnical information for this location. o There is an associated Camp 7 road improvement project that may be a factor related to this project depending on the timing of each project.

Post-Bid

Bridges / Tunnels

$700,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
73
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

May 23, 2022

img_map_placeholder

Multiple Locations, McMillan Township, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.