BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for an educational facility in Morgantown, West Virginia. Completed plans call for site work for a educational facility; and for asbestos abatement for a one-story above grade educational facility.

Asbestos removal from the hard ceiling, and plaster ceiling demo/removal. Remove all asbestos floor tiles and bead blast floor. Working hours: Friday 5pm through Monday at 5am, with clearance completed by 5am on Monday to allow for occupation beginning at normal business hours. Abatement will be performed in phases that can be completed within these working hours. Funding- Phase 2 Infrastructure Bond Money- funds approved and ready Projected Start Date is to be May 13, 2022 Substantial Completion shall be July 3, 2022 Final Completion shall be July 17, 2022 This space contains lab areas. All lab areas must be fully sealed before abatement starts. WVU will adjust the mechanical system to make sure the rooms are not pulling in dust, but all doors and penetrations must be fully sealed. The bid/proposal process is highly controlled. To protect the integrity of the process, any questions or clarifications regarding this Request for Bid/Proposal must be handled through the Department of Procurement, Contracting, & Payment Services. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated below. The date of issuance of the West Virginia University's Notice to Proceed and/or Contact shall be used to calculate Substantial and Final Completion if contract time stated below is in number of calendar days. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay in achieving Substantial Completion and Two Hundred and Fifty Dollars ($250) per Calendar Day of delay in achieving Final Completion.

Post-Bid

Educational

$407,000.00

Public - State/Provincial

Asbestos Abatement, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
30
Bidding Soon
564
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

May 13, 2022

img_map_placeholder

1 Medical Center Dr, Morgantown, WV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.