EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 30, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Poughkeepsie, New York. Completed plans call for the renovation of a educational facility.

Early Learning Center 372 Church Street, Poughkeepsie, NY 12601 SED Project NO: 13-15-00-01-0-008-022 Columbus School 18 South Perry Street, Poughkeepsie, NY 12601 SED Project NO: 13-15-00-01-0-001-014 Morse Elementary School 101 Mansion Street, Poughkeepsie, NY 12601 SED Project No: 13-15-00-01-0-002-014 Poughkeepsie Middle School 55 College Avenue, Poughkeepsie, NY 12601 SED Project No: 13-15-00-01-0-015-021 Clinton Elementary School 100 MontgomeryStreet, Poughkeepsie, NY 12601 SED Project No: 13-15-00-01-0-004-014 Krieger Elementary School 265 Hooker Avenue, Poughkeepsie, NY 12603 SED Project NO: 13-15-00-01-0-006-014 Warring Elementary School 283 Mansion Street, Poughkeepsie, NY 12601 SED Project No: 13-15-00-01-0-005-013 Poughkeepsie High School 70 Forbus Street, Poughkeepsie, NY 12603 SED Project No: 13-15-00-01-0-007-018 Project Identification: Poughkeepsie CSD - Phase 1B Building Improvements Project Description: Project consists of building improvements (including, but not limited to, boiler replacement, roofing replacement and restoration, and toilet room and locker room renovations) as described in the Contract Documents. BID SECURITY A. Bid security shall be submitted with each bid in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the Instructions to Bidders. All bid addenda will be transmitted to registered plan holders via email and will be available Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. D. A Bidder, upon 1) making the deposit required for the Bid Documents, 2) submitting a Proposal accompanied by the required bid security, and 3) returning the plans and specifications used by such Bidder in good condition within thirty (30) days following the award of the Contract, or rejection of the Bid, shall have returned to them the full amount of the deposit for one copy of the plans and specifications. TIME OF COMPLETION A. Successful bidder shall begin the Work upon receipt of the Notice to Proceed and shall complete the Work within the Contract Time NOTIFICATION A. Attention of the Bidder is particularly called to the Owners sales tax exemption, the requirements as to conditions of employment to be observed, and the minimum wage rates to be paid under the Contract. In addition, the Bidding Documents contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party, a statement of suretys intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. B. Bids shall be prepared as set forth in Instructions to Bidders, enclosed in a sealed envelope bearing on its face the name and address of the Bidder and the title of the Work to which the bid enclosed relates. C. No bids may be withdrawn for a period of forty-five (45) days after opening of bids. AWARD OF BIDS A. The Poughkeepsie City School District hereby reserves the right to waive any informalities and reject any, or all, Bids or to accept the one that, in its judgement, will be in the best interest of Poughkeepsie City School District. B. The Owner further reserves its right to disqualify Bidders for any material failure to comply with the "Instructions to Bidders

Post-Bid

Educational

$600,000.00

Public - City

Renovation

384

23

54

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Temporary Barriers and Enclosures, Temporary Fencing, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Roofing and Siding Panels, Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furniture, Seating, Chairs, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel Systems, Facility Fuel Piping, Facility Fuel-Oil Piping, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Special Exhaust Systems, Sawdust Collection Systems, Air Terminal Units, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Instrumentation and Terminal Devices, Integrated Automation Instrumentation and Terminal Devices for HVAC, Integrated Automation Control Dampers, Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Trenching, Fill, Backfill, Trenching and Backfilling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
262
Bidding Soon
4,902
All Active Projects
2,083
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

July 18, 2022

img_map_placeholder

283 Mansion St, Poughkeepsie, NY

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase 1B - Building Improvements - Contract 24: Warring ES - Mechanical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.