BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2022 at 8:00 PM

Updated September 14, 2023

Site work and outdoor lighting for a mixed-use development in Gillette, Wyoming. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; pre-engineered storage facility; pre-engineered storage facility; and water / sewer project.

This Project Removes an Existing 35' X 50' Wood Construction Park Shelter and Replaces It With a New 35' X 50' Prefabricated Metal Park Shelter With an Asphalt Shingle Roof. Also Included Is the Installation of Eight (8) Lights and Six (6) Receptacles Including Conduit and Removal and Replacement of the Concrete Pad Under the Shelter. A New Water Fountain Will Be Installed Including the Relocation of the Water Service.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$211,210.00

Public - City

Outdoor Lighting, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
11
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

May 3, 2022

Project location map

909 S Gillette Ave, Gillette, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.