Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Surry, Virginia. Contact the soliciting agency for additional information.
1. Bidder can bid on (1) one or more lots to be considered in evaluations. 2. Note: Award(s) will be made by lot based on available funding. Lot bids must not be dependent on receipt of award of other lots and all costs per lot must be included in bid. 3. Bidder must return information listed below. Failure to return requested information at time of bid may result in bid being deemed non-responsive. a. Attachment A-Vendor Data Sheet b. Copy of General Contractors License in accordance with value of work performed. c. Workmanship Warranty information. Section B- #5 d. Paint brand and specifications sheets, product information. I. PURPOSE: The purpose and intent of this Quick Quote is to obtain a fixed price bid to furnish all labor, materials, tools, equipment, insurance, and supervision to conduct painting maintenance on (4) structures located on grounds of Chippokes State Park. II. SPECIFICATIONS/SCOPE OF WORK: Contractor shall provide a fixed price bid to include the following minimum specifications to paint exterior of buildings located at Chippokes State Park, 695 Chippokes Park Road, Surry, Virginia 23883, per specifications below: A. Lot 1: Building A- est. 946 sqft (Intern) 1. Contractor will be responsible for cleaning, preparation (filling holes, caulking, etc.), and painting of wood of all exterior parts of the building. 2. Contractor will provide ALL painting supplies and equipment (brushes, rollers, ladders, poles, rags, caulk, etc.) and paint. 3. Contractor shall provide paint Sherwin Williams Exterior Grade Super paint to be identified at time of bid or Agency approved equivalent. The color code shall be selected by the park staff prior to start of work. 4. Contractor shall provide (2) two coats minimum as full coverage. 5. Contractor shall provide all signage to mark areas work is being conducted according to all OSHA rules and regulations. 6. Contractor shall coordinate painting schedule with park prior to work based on activity being conducted in the area. 7. Contractor shall be responsible for removing and reinstalling all existing devices presently mounted on existing walls and ceilings as it applies to the painting area. To include but not limited to light fixtures, fans, shutters etc. 8. Contractor will be responsible for removing and replacing shutters in areas where painting is necessary. No painting of shutters is required. 9. Contractor will be responsible for cleaning, preparation (filling stucco voids, caulking, etc.) and painting all stucco on front and chimneys of the building B. Lot 2: Building B- est. 768 sqft (Quarters) 1. Contractor will be responsible for cleaning, preparation (filling holes, caulking, etc.), and painting of wood of all exterior parts of the building. 2. Contractor will provide own painting supplies and equipment (brushes, rollers, ladders, poles, rags, caulk, etc.) and paint. 3. Contractor shall provide paint Sherwin Williams Exterior Grade Super paint color code or Agency approved equivalent. The color shall be selected by the park staff prior to start of work. 4. Contractor shall provide (2) two coats minimum as full coverage. 5. Contractor shall provide all signage to mark areas work is being conducted according to all OSHA rules and regulations. 6. Contractor shall coordinate painting schedule with park prior to work based on activity being conducted in the area. 7. Contractor shall be responsible for removing and reinstalling all existing devices presently mounted on existing walls and ceilings as it applies to the painting area. To include but not limited to light fixtures, fans, shutters etc. 8. Contractor will be responsible for removing and replacing shutters in areas where painting is necessary. No painting of shutters is required. 9. Contractor will be responsible for cleaning, preparation (filling stucco voids, caulking, etc.) and painting all stucco on front and chimneys of the building C. Lot 3: Building C - est. 840 sqft (Archival/Blount) 1. Contractor will be responsible for cleaning, preparation (filling holes, caulking, etc.), and painting of wood of all exterior parts of the building. 2. Contractor will provide own painting supplies and equipment (brushes, rollers, ladders, poles, rags, caulk, etc.) and paint. 3. Contractor shall provide paint Sherwin Williams Exterior Grade Super paint to be identified at time of bid or Agency approved equivalent. The color code shall be selected by the park staff prior to start of work. 4. Contractor shall provide (2) two coats minimum as full coverage. 5. Contractor shall provide all signage to mark areas work is being conducted according to all OSHA rules and regulations. 6. Contractor shall coordinate painting schedule with park prior to work based on activity being conducted in the area. 7. Contractor shall be responsible for removing and reinstalling all existing devices presently mounted on existing walls and ceilings as it applies to the painting area. To include but not limited to light fixtures, fans, shutters etc. 8. Contractor will be responsible for removing and replacing shutters in areas where painting is necessary. No painting of shutters is required. 9. Contractor will be responsible for cleaning, preparation (filling stucco voids, caulking, etc.) and painting all stucco on front and chimneys of the building. (Please see product specification in section G for this building) D. Lot 4: Building D - est. 4500 sqft (Jones- Stewart Mansion) 1. Contractor will be responsible for cleaning, preparation (filling holes, caulking, etc.), and painting of wood of all exterior parts of the building, including windows, doors, porches, steps, etc. 2. Contractor will provide own painting supplies and equipment (brushes, rollers, ladders, poles, rags, caulk, etc.) and paint. Colors will be selected by park. 3. Contractor shall provide paint Sherwin Williams Exterior Grade Super paint to be identified at time of bid or Agency approved equivalent. The color code shall be selected by the park staff prior to start of work. 4. Contractor shall provide (2) two coats minimum as full coverage. 5. Contractor shall provide all signage to mark areas work is being conducted according to all OSHA rules and regulations. 6. Contractor shall coordinate painting schedule with park prior to work based on activity being conducted in the area. 7. Contractor shall be responsible for removing and reinstalling all existing devices presently mounted on existing walls and ceilings as it applies to the painting area. To include but not limited to light fixtures, fans, shutters etc. 8. Contractor will be responsible for removing and replacing shutters in areas where painting is necessary. No painting of shutters is required. 9. Contractor will be responsible for cleaning, preparation (filling stucco voids, caulking, etc.) and painting all stucco on front and chimneys of the building.
Post-Bid
Playgrounds / Parks / Athletic Fields
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2022
May 13, 2022
695 Chippokes Park Rd, Surry, VA
Related To This Project
Surry, VA
--
Surry, VA
Bid Date: Jul 01 2022
Surry, VA
Bid Date: Apr 05 2023
Surry, VA
Bid Date: Jul 11 2023
Surry, VA
Bid Date: Sep 27 2023
Surry, VA
Bid Date: Mar 08 2022
Surry, VA
Bid Date: Jan 06 2023
Surry, VA
Bid Date: Oct 10 2023
Henrico, VA
Bid Date: Jan 26 2022
Chesterfield, VA
--
Stafford, VA
Bid Date: Mar 22 2022
Newport News, VA
Bid Date: Mar 25 2022
Vienna, VA
Bid Date: Jan 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.