BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Santa Barbara, California. Completed plans call for site work for a water / sewer project.

Liquidated Damages $1,140 per day The estimated construction cost is $5,100,000 Location and Description. The Project is located at 404 Alan Road, Santa Barbara, California and is described as follows Question Deadline 01/23/2023 at 3:00 PM PT Online Q&A Yes Questions may be directed to: Barbara August, SWRCB Barbara.August@waterboards.ca.gov Phone: (916) 341-6952 Fax: (916) 327-7469 The Work involves rehabilitation of the Braemar Lift Station. It consists of replacement of existing pumps, valves, and piping, replacement of existing ventilation fans and ducting in the dry well, replacement of valve vaults, installation of new variable frequency drives, construction dry flood proofing measures, and replacement of existing motor control center and control system. The Project site is located at the Braemar Lift Station situated on the corner of Cliff Drive and Alan Drive, Santa Barbara, California. The Project is intended to replace aging equipment, and address long standing issues with odor control and operational and maintenance challenges. The limits of work are restricted to north of the existing sidewalk, south of the dry well and electrical room, and directly east of the existing station. The limits of works are restricted to developed, disturbed, and ornamental areas measuring roughly 640 square feet within the limits of the existing Braemar Lift Station. Construction is scheduled to begin August 2022 and complete October 2023. The work generally includes replacement of the existing pumps and motors with new units including Variable Frequency Drives (VFD). Other work items include the ventilation system, wet well, motor control center, supervisory control and data acquisition system, the removal of two site walls and exterior piping, replacing pumping and electrical systems, rehabilitation of the wet-well interior, and replacement of outiet piping and valves adjacent to the building. There will be demolition of the existing ornamental planter area to provide for relocation of the emergency pump bypass connections, including construction of a new catch basin and drain piping, which is proposed to be graded and revegetated after construction. Revegetation will follow the policies designated in the City of Santa Barbara's Coastal Land Use Program / Coastal Land Use Plan (2019), including Policy 4-1.19 (Plantings within ESHA Buffer) and Policy 4.1-36 (Bird Breeding and Nesting). PROJECT NO. 48367, BID NO. 5439 The City anticipates work to begin on or about March, 2023. The construction completion is 670 calendar days.

Award

Water / Sewer

$6,479,626.00

Public - City

Site Work

131

45

17

7

Subscribe For Documents

100 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
66
Bidding Soon
1,227
All Active Projects
545
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2023

April 10, 2023

img_map_placeholder

404 Alan Rd, Santa Barbara, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.