BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2022 at 8:00 PM

Updated January 29, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Lafayette, Indiana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Tippecanoe County Replacement of Bridges 83 and 80 (Des # 2101726 and 2101724) in the Crawfordsville District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Stewart W Kline, PE / Highway Director 20 North Third Street Lafayette, Indiana 47901 765-423-9210 skline@tippecanoe.in.gov Local Public Agency: Tippecanoe County Project Location: Bridge 83 is on CR 510S over Flint Creek 0.35 miles East of CR 900W and Bridge 80 is on CR 700W over Flint Creek 0.34 miles South of CR 500S Project Description: Bridge 83 will be replaced with a new, three span Concrete I Beam structure. To correct the existing substandard alignment, the bridge will be built on a new 760' horizontal curve. The new deck will provide for a 32-foot clear roadway and include a new PF-1 rail system. The approaches will be built with two twelve-foot travel lanes and 4-foot-wide safety shoulders, W-Beam approach guardrail, and OS safety end treatments. Bridge 80 will be replaced with a new, single span Concrete Bulb-T Beam structure. The new deck will provide for a 28-foot clear roadway and include a new TS-1 rail system. The approaches will be built with two twelve-foot travel lanes and 2-foot-wide paved shoulders, W-Beam approach guardrail, and OS safety end treatments. Phases Included: PE and RW Funding: 80% STBG Term of Contract: Until Project Complete The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Tippecanoe County Replacement of Bridges 83 and 80

Conceptual

Bridges / Tunnels

$600,000.00

Public - County

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
83
Bidding Soon
1,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2023

Project location map

Multiple Locations, Lafayette, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.