Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 7, 2022 at 8:00 PM
Updated February 12, 2026
Site work and paving for a mixed-use development in Kitchener, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Rossford Crescent Reconstruction - Markwood Drive to Markwood Drive, extending over an approximate project distance of 530 meters. The work includes the replacement of the existing sanitary sewer, storm sewer, water supply system, roadway, curb and gutter, new infill sidewalk on one side and municipal service connections to the street property line. The work also includes upgrades to the stormwater quality system with a new "isolator row" and Oil Grit Separator (OGS) to be located along the Gzowski Park pedestrian access between Rossford Crescent and Gzowski Park. The scope of work also includes, shoring, dewatering, AC pipe removal, abandoned gas main (local) removal (incidental), management of excess soil, and temporary water supply, and intersection work at Markwood Drive. Documents are available at: https://kitchener.bidsandtenders.ca
Award
Roads / Highways
$5,265,035.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2022
May 9, 2022
Rossford Crescent, Kitchener, ON
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
