BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work for a bridge / tunnel in Rolling Hills, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Culvert Installation and Other Work 875:04 Bridge File 72029 Carrying Highway 875:04 over Twelve Mile Coulee kilometre 24.977 to 24.977 SOUTHERN REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 72029) 1 Lump Sum Demolition and Disposal of Bridge Structure 62 Metre CSP with Couplers - Supply 62 Metre CSP - Assembly 1 Lump Sum Backfill - Crushed Aggregate 1 Lump Sum Backfill - Non-Granular 200 Cubic Metre Heavy Rock Riprap (Class 1) 1 Lump Sum Roadway Work (B.F. 72029) Contractor to supply all materials. Question Deadline 06/27/2025

Award

Bridges / Tunnels

$1,249,258.00

Public - State/Provincial

Site Work

25

15

2

4

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
118
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

September 1, 2025

Project location map

AB-875, Rolling Hills, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.