EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Morrison, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work of 4.93 total miles of Various Roads in Whiteside County. Estimate of material quantities consist of: 327 Sq Yds of HMA Surface Removal (Butt Joints), 20,715 Lbs of Bituminous Tack Coat, & 3,616 Tons of HMA Mix C, N50, IL-9.5 (Surface). All proposals must be submitted on forms provided by the Whiteside County Highway Department. No duplications of these forms will be allowed. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) The Public Works Committee reserves the right to reject any or all bids, to waive technicalities and to accept the proposal which is most advantageous to Whiteside County. The work included in this section shall consist of Bituminous Surface Removal - Butt Joints, the application of Bituminous Materials Tack Coat, placement and compaction of various depths of HMA Surface Course IL-9.5 Mix C N50 and other related items as specified by the Engineer.

Bid Results

Roads / Highways

$314,257.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
53
Bidding Soon
645
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

May 12, 2022

img_map_placeholder

Multiple Locations, Morrison, IL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Hot Mix Asphalt - Surface Course

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.