BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Cherry Point, North Carolina. Completed plans call for the renovation of a military facility.

Contract Award Date: Jun 30, 2022 Contract Award Number: N4008519F8044 Task/Delivery Order Number: N4008522F5187 Contractor Awarded Unique Entity ID: PAL3KHU82R65 Contractor Awarded Name: JOYCE & ASSOCIATES CONSTRUCTION INC Contractor Awarded Address: Newport, NC 28570-3728 USA Base and All Options Value (Total Contract Value): $17795.00 Public Works Project No.: 7075795 Title: B1799 Lithium Shelter Needs Power and Grounding NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $36.5 Million Contract Completion Date: All work shall be completed within 90 calendar days after award. Estimated Cost Range: Less Than $25,000. Wage Determination: General Decision Number: NC20220065 02/25/2022 Liquidated Damages: $18.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled Friday 1 April 2022 at 1000. Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE. o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. Proposal Due Date: 20 April 2022, 1200 local time E-Mail Address for Proposals: 1. roicc_chpt_ktr_bids@navy.mil 2. joseph.a.schwarz4.civ@us.navy.mil 3. ericka.j.bishop.civ@us.navy.mil Requests for Information (RFIs): RFIs must be submitted to the email addresses above. The cut off for RFIs is 11 April 2022 by 0900 in order to process all inquiries by the proposal due date. The specifications and drawings are posted as attachments at WWW.SAM.GOV. The work includes providing power to a standalone Lithium shelter outside Building 1799 and grounding the entire Lithium shelter, and incidental related work.

Award

Military

$17,795.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
45
Bidding Soon
581
All Active Projects
268
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 20, 2022

May 20, 2022

August 18, 2022

img_map_placeholder

To Be Determined, Cherry Point, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.