BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and library.

The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 8.7% 2. ELBE participation 11.5% 3. Total mandatory participation 20.2% Response Format Electronic Project Type Bid Response Types Line Items Subcontractor Bid Bond Bid Valid 120 Calendar Days Liquidated Damages $1000 per day Estimated Bid Value $3,810,000.00 Start/Delivery Date Project Duration 550 Working Days Pre-Bid Meeting No Online Q&A No Improvement to the Scripps Miramar Ranch Branch Library, that includes and not limited to the expansion of the existing library parking to provide additional parking spaces, improvements of the existing parking, additional driveways entrance, and the upgrade of the existing library driveway entrance with new traffic signals, signs, street crossings, pedestrian ramps and associated Scripps Lake Drive street improvements. New retaining walls are required to be designed, permitted, and installed, along with the import of soil to fill the existing canyon where the parking expansion is planned. New ADA / Code compliances sidewalks, ramps, and signs. New parking lights, drainage, landscaping, and irrigation systems. Mobilization, demobilization, disposal of demolished and excavated material. This Scope of Work shall include and not limited to; Code Required Special Inspections, Traffic Control Permit, BMP, Street Sweeping and Potholing. The work shall be done in two (2) ADA compliant phases, per the City Whitebook Section 6-1.2.1, to allow the library to stay operational during the construction duration. The general contractor shall propose the two (2) phases and need the Citys approval prior to proceed. The first phase may be the construction of the new driveway entrance, backfill the canyon, building retaining walls (A & B), and part of the new parking (including its smaller retaining walls, biofiltration basins and others, TYP), and the second phase may be the rest of the project.

Bid Results

Roads / Highways

$6,347,050.00

Public - City

Paving, Site Work

63

15

20

7

Subscribe For Documents

125 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
48
Bidding Soon
1,233
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2023

May 15, 2023

img_map_placeholder

10301 Scripps Lake Dr, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.