BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a military facility in Warren, Michigan. Completed plans call for site work for a military facility.

The Army Contracting Command - Detroit Arsenal (ACC-DTA) intends to competitively award, under a Total Small Business Set-Aside, a new Firm Fixed Price (FFP), for the installation of fiber optic cabling. This effort is in support of the Program Executive Office for Ground Combat Systems (PEO GCS) mission to have fiber optic cabling installed between building 270 and 229 at the Detroit Arsenal. Performance Work Statement (PWS) US Army Garrison - Detroit Arsenal Building 270 to Building 229 Fiber Cabling Network Enterprise Center - Detroit Arsenal (NEC-DA) C.1 PROJECT TITLE: NEC-DA Fiber Optic Cabling Installation C.2 BACKGROUND: NEC-DA requires the installation of fiber optic cabling between building 270 and 229 in accordance with (IAW) section C.4. C.3 SCOPE OF WORK: The contractor shall furnish, install, terminate, label, and test all cabling, components, and materials in order to meet the requirements in section C.4. Items and materials not listed, which are incidental to the work being accomplished, shall be as recommended by the product manufacturer and/or in compliance with current industry standards and approved by the Project Manager or Contracting Officer's Representative (COR). Description of Work: All work described in this document shall be performed using the technical references listed below or as instructed by the COR. Unified Facilities Criteria (UFC) for Telecommunications Interior Infrastructure Planning and Design (UFC 3-580-01) NEC - National Electric Code TIA/EIA 526-7 - Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant - OFSTP-7 TIA/EIA 526-14 - Optical Power Measurement of Installed Multimode Fiber Cable Plant -- OFSTP-14 TIA/EIA 568-1 - Commercial Building Telecommunications Cabling Standard Part 1: General Requirements TIA/EIA 568-2 - Commercial Building Telecommunications Cabling Standard Part 2: Balanced Twisted-Pair Cabling Components TIA/EIA 568-3 - Optical Fiber Cabling Components Standard TIA/EIA 569 - Commercial Building Standards for Communications Pathways and Spaces TIA/EIA 598 - Optical Fiber Cable Color Coding EIA/TIA 606 - Administration Standard of Telecommunications Infrastructure EIA/TIA 607 - Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications TIA-758 - Customer-owned Outside Plant Telecommunications Infrastructure Standard (August 2004) CUITN Gigabit Ethernet Data Design Guide (US Army CECOM) AMSEL-IE-DE-04-055 - Worldwide Outside Plant Design and Performance Requirements - OSPDPR (US Army ISEC) AMSEL-IE-01003 - Army SIPRNet Security Design Guide, For Official Use Only (FOUO) NSTISSI TEMPEST/2-95 - Red/Black Installation Guide (FOUO) NSTISSI No. 7003 - Protected Distribution Systems OSHA Construction Industry and General Industry Standards 1926.21(b) (6) and 1910.146 for Confined Space Entry C.4.2 Specific Requirements: The contractor's proposal shall include cost for labor and materials for the work requested below. All new cable will be Single-Mode, Plenum Rated (Internal Building), with SC type patch panels (if required) and connectors. Telecommunications system labeling shall be completed in accordance with ANSI/TIA/EIA-606-A and shall conform to the Network Enterprise Center (NEC) standard. All cabling shall be labeled on both ends, within 12 inches of the end of the cable jacket, which shall be visible on the exposed part of the cable jacket. Install 24 Strand SM Plenum Rated Fiber Optic Cabling from Building 270 1st Floor (TR -100) Room 1402-U to Building 229 1st Floor (TR-14) Room 1B090-U o Building 270 end of Fiber Optic Cable shall be terminated with SC Style Connector pigtails and installed within existing Fiber Patch Panel o Building 229 end of Fiber Optic Cable shall be terminated with SC Style Connector pigtails and installed within New Wall Mounted Fiber Patch Panel Install 6 Strand SM Armored Fiber Optic Cabling from Building 229 1st Floor (TR-14) Room 1B090-U to Building 229 3rd Floor Room 300W (Secure Room) o Note: This cable run will pass through Building 229 3rd Floor Telecom Room (TR-16) and terminate in Room 300W (Secure Room). o Building 229 1st Floor end of Fiber Optic Cable shall be terminated with SC Style Connector pigtails and installed within New Wall Mounted Fiber Patch Panel o Building 229 3rd Floor end of the Fiber Optic Cabling shall terminated with SC Style Connector pigtails and installed within New Wall Mounted Fiber Patch Panel. Inter-building Breezeway o New conduit sleeves shall be installed in the breezeway between Building 270 and Building 229, for inter-building pathway.

Post-Bid

Military

$30,000.00

Public - Federal

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
188
Bidding Soon
2,665
All Active Projects
1,089
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 4, 2022

April 21, 2022

September 30, 2022

img_map_placeholder

6501 E Eleven Mile Rd, Warren, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.