Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2022 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in East Rockland Key, Florida. Contact the soliciting agency for additional information.
The Florida Keys Aqueduct Authority (FKAA), pursuant to Florida Statutes, Chapter 287.055, Consultants Competitive Negotiations Act, is seeking a professional consulting firm to enter into a contract to perform a baseline energy and resiliency assessment, provide a quantification of energy and cost reduction strategies and target setting, and develop action plans to integrate and implement priority projects. The Florida Keys Aqueduct Authority (FKAA) is the sole provider of potable water for all the residents, businesses, institutions, and military facilities in the Florida Keys and also provides centralized wastewater services to a portion of those residents. Risk, resiliency and sustainability are central to the utility's operations and future viability. These tenants are also at the forefront in the State of Florida, where the Governor has recently pledged one billion dollars to resiliency efforts and where a new Statewide Office of Resilience has been established directly under Governor DeSantis. Being well positioned will allow the Authority to quantify future benefits, realize costs savings and capitalize on funding opportunities. The program will provide a strong foundation for the future, solidifying core components of the Authority's mission including becoming a nationally renowned, community-oriented utility, providing reliable, safe and efficient water and wastewater services in a fiscally and environmentally responsible manner. Scope of Services The services desired are outlined below. This scope of services may be expanded at the discretion of FKAA to include other consulting assignments related to this effort. - Perform a baseline energy use and GHG emissions study - Provide a quantification of reduction strategies and target setting based on the assessment - Develop implementation action plans in conjunction with staff for cost savings and energy reduction strategies. Plans should include key steps, timelines, funding resources, and metrics of success. - Develop and provide tools, templates and training to allow the Authority to continue this work beyond the contract Consulting firms must be fully licensed for the type of work to be performed in the State of Florida at the time of RFQ receipt. Consulting firms that are not fully licensed and certified shall be rejected. Each firm must submit annually statements of qualifications and performance data. Selected firms will remain on the qualified list for three (3) - years with an option to renew annually for two (2) years as long as firm remains qualified, responsive, and responsible. The method of contractor selection has not been determined at this time.
Conceptual
Municipal
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2022
Multiple Locations, East Rockland Key, FL
Related To This Project
East Rockland Key, FL
Bid Date: Oct 04 2023
East Rockland Key, FL
--
East Rockland Key, FL
Bid Date: Jan 07 2026
East Rockland Key, FL
Bid Date: Mar 01 2022
East Rockland Key, FL
Bid Date: Jan 10 2022
East Rockland Key, FL
Bid Date: Sep 27 2022
East Rockland Key, FL
Bid Date: Jul 06 2022
East Rockland Key, FL
Bid Date: Jun 29 2022
East Rockland Key, FL
--
East Rockland Key, FL
--
East Rockland Key, FL
--
East Rockland Key, FL
Bid Date: May 10 2022
North Port, FL
Bid Date: Mar 29 2022
West Palm Beach, FL
--
Orlando, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
