BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 25, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a medical facility in Appleton, Wisconsin. Completed plans call for the renovation of a medical facility.

The COOP closet houses servers and electronics which generate an abundance of heat. The main air conditioning system is a Liebert 5 ton system which is able to keep the space conditioned and humidified to maintain 70 degrees in the space at all times "The Contractor shall provide labor and all materials needed to convert the buildings existing electrical service into two separate services from We Energies utilities." Requesting bids for a contractor to provide all material and labor to install a backup split air condition system at Brewster Village. $50.00 per calendar day liquidated damages penalty.

Award

Medical

$8,450.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
78
Bidding Soon
631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

May 20, 2022

Project location map

3300 W Brewster St, Appleton, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.