BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a service station / car wash facility in Charlotte, North Carolina. Completed plans call for site work for a service station / car wash facility.

Installation of two new 150KW electrical vehicle (EV) fast chargers and six EV charging station dispensers for the electrical buses at Charlotte Douglas International Airport (CDIA). The work includes, but is not limited to, the required electrical work to install two new 150KW EV chargers and six charging EV dispensers, with each of the EV chargers supporting three dispensers. Preferred brand alternates, to the extent applicable, will be addressed at the Pre-Bid Conference.

Bid Results

Service Station / Car Wash

$131,965.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
137
Bidding Soon
1,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

May 20, 2022

Project location map

5501 Josh Birmingham Pkwy, Charlotte, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.