BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 6, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Cedar Park, Texas. Contact the soliciting agency for additional information.

As of July 6, 2022, the project is under construction. The content team is working to obtain the general contractor information. The City of Cedar Park requests Proposals for 3rd party inspection / observation services for the Holy Cross Coptic Orthodox Church Subdivision Improvements Project. Project Scope will included 3rd party inspection / observation services for the construction of Holy Cross Drive and utility extensions. Holy Cross Drive is the south leg of the Brushy Creek Road and Vista Ridge Boulevard intersection in Cedar Park, Texas. The proposed private road will be built to urban street standards for flexible pavement section, laydown curb, and sidewalk. The road is approximately 700 feet in length and includes a CapMetro railroad crossing, detention and water quality facilities, signal modification, striping, lighting and landscaping. In addition to the road, the project also includes construction of public water and wastewater extensions to the proposed church site. Specific Construction Phase Services for which we are requesting proposals for are daily inspection / observation, review of quality assurance testing, identification of deficiencies and design conflicts, and coordination with design engineers, contractor's representatives and project managers. A contractor hired by the developer and not the city will construct the project. All work performed in CapMetro Railroad right-of-way will be performed by CapMetro contractors, or contractors approved by CapMetro who have completed rail safety training. Questions shall be directed to the Engineering and Capital Projects Department via appointment, telephone or email. Please contact Emily Truman at 512-401-5356 or emily.truman@cedarparktexas.gov

Under Construction

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
127
Bidding Soon
2,829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.