BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Grover Beach, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

General Work Description: In general, the Base Bid Work shall be infilling sidewalk, curb, and gutter. Activities include mobilization, public notification and interaction activities, construction surveying and staking, traffic control, clearing and grubbing of debris (plant, soil, abandoned landscape features, etc.) within the Work limits, resetting of mailboxes, resetting of sign posts, tree removal, hot mix asphalt repaving at conform areas, concrete curb and gutter, concrete cross-gutter, concrete sidewalks and driveways, retaining curbs, accessibility improvements, curb ramps, spandrels and installation of pavement striping and markings. SIDEWALK INFILL PROJECT, CIP 2274 S. 4 th Street at Trouville Avenue S. 10 th Street (Rockaway Avenue to Long Branch Avenue) N. 9 th Street at Saratoga Avenue The estimated opinion of probable construction cost for this Base Bid Work is $200,000.00. Conditions of Submitting a Bid: Bids are required for the entire Work described herein. The Contractor shall possess a Class A license at the time this Contract is awarded through Contract acceptance (Public Contract Code Section 10164). The Contractor and all subcontractors will be required to obtain a City of Grover Beach Business Tax Certificate at the time the Contract is awarded. This Contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990. Each bid shall be accompanied by cash, certified or cashiers check, or bidders bond for not less than ten percent (10%) of the amount of the base bid, made payable to the City of Grover Beach. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project available from the California Department of Industrial Relations Internet web site at electronically. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal or be awarded a contract for public work on public works project unless registered with the Department of Industrial Relations. Notice is also hereby given that any or all bidders may be required to furnish a sworn statement of their financial responsibility, technical ability and experience before award is made to any particular bidder. Bidders shall contact the City of Grover Beach Department of Public Works office at (805) 473-4530 the day prior to bid opening to obtain any bidding addenda information. Submittal of a signed bid shall be evidence that the Bidder has obtained this information and that the bid is based on any changes contained therein. Submittal of Bidders Inquiries: Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Bidders inquiries shall be submitted in writing via e-mail to the City of Grover Beach, Public Works Department, at: PublicWorks@groverbeach.org. The cutoff time that the City will accept bidders inquiries is 5:00 p.m. on the fifth business day prior to the bid opening date. Do not count the bid opening date when counting the days. The City will respond to inquires via bidding addenda. Any such inquiries, submitted after the cutoff time of receiving bidders inquiries, will not be treated as a bid protest. Bid Submittal Instructions: On the outside of the bid envelope the Bidder shall indicate the following: 1. Name and Address of Bidder 2. Name of project on which bid is submitted 3. Date and time of bid opening The right is reserved by the City of Grover Beach to reject any or all bids, to evaluate the bids submitted, and award the Contract to the lowest responsible bidder. The City further reserves the right to waive any informalities or minor irregularities in the bid. No bidder may withdraw his bid for a period of sixty (60) working days after the date set for the opening thereof.

Bid Results

Sidewalks / Parking Lot

$196,371.00

Public - City

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
261
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

May 20, 2022

img_map_placeholder

Multiple Locations, Grover Beach, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.