BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Los Angeles, California. Completed plans call for the renovation of a water / sewer project.

**Project was awarded to Kiewit Infrastructure West Co. for for $70,437,000.00 including $50,355,000.00 for the Ballona Creek Water Quality Improvements Capital Improvement Project (CIP) J598 and $20,082,000.00 for the Sepulveda Channel Low Flow Treatment Facility CIP J925. Ballona Creek Water Quality Improvement ( LFTF #1 ) (CIP J598, W. O. S33WLFT1) At a City of LA owned decommissioned sewer overflow treatment plant (North Outfall Treatment Facility, NOTF) in Culver City, at the bank of Ballona Creek, which has a drainage area of 55,000 acres. This will divert part of the dry-weather flow from Ballona Creek and treat it with Ozone at NOTF, diverting the rest to the Hyperion Water Reclamation Plant (Hyperion) via the North Outfall Sewer (NOS). The treated flow will be discharged back to the creek to improve its beneficial uses. The maximum design flow for the pump station is 29 million gallons per day (MGD) or 45 cubic feet per second (cfs). The treatment design flow for Ozone system is up to 6 MGD (9.3 cfs) and the remaining flow of up to 23 MGD (35.6 cfs) will be diverted to the NOS &Hyperion. Components include flow diversion system; influent channel; dry/wet well; pump station; ozone treatment system; tie-in structure to the NOS; and associated electrical, instrumentation & control systems. Sepulveda Channel Low Flow Treatment Facility (LFTF #2) (CIP J925, W. O. S33WLFT2) Along Sepulveda Channel, near Culver Blvd, with a drainage area of approximately 15,000 acres. This will divert the flow from Sepulveda Channel, treat the captured water, and return the treated water back into the channel. Components include flow diversion structure; pump station; trash and silt screens; Ozone treatment system; & associated electrical, instrumentation, and control systems. The treated flow will be discharged back into Sepulveda Channel. The design flow of the project is 1.3 MGD (3 cfs).

Award

Water / Sewer

$140,874,000.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
607
Active Projects
262
Bidding Soon
3,499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2022

July 25, 2022

Project location map

Multiple Locations, Los Angeles, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.