BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and new construction of a mixed-use development in Dayton, Minnesota. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; playground / park / athletic field; bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Project Category Code: Parks, Recreation, Trail Work, Landscaping (Tree and Shrub Clearing), Paving - Concrete, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Tree Cutting, Aggregate, Buildings and Grounds/Athletic/Sports Facilities, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Concrete Pavement, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Grade and Surface, Landscaping, Excavation, Street/Road Materials, Landscaping - Seeding, Stormwater Improvements, Paving (Asphalt or Concrete), Landscaping (Retaining Walls), Pedestrian Improvements, Paving (Trail Paving), Curbs, Furniture, Fixtures, Equipment, Grubbing & Clearing, Bridges/Overpasses The bids received will be publicly opened and read aloud, for the furnishing of all labor and material for the construction of the three different projects included in the 2022 Dayton Parks Improvement Package. Major components of the work include: #1. Donahue Dells Neighborhood Park 1. Earthwork and final grading 2. Concrete patio and pedestrian walkways 3. Limestone seat blocks 4. Concrete playground curbing 5. Site furnishings 6. Landscape planting including perennials and lawn seeding #2. Hayden Hills Neighborhood Park 1. Earthwork and final grading 2. Basketball court surfacing 3. Chainlink backstop and aglime surfacing 4. Park shelter 5. Playground areas 6. Asphalt trails 7. Double pickleball courts 8. Synthetic golf chipping and putting feature 9. Landscape planting including trees, shrubs, and lawn seeding #3. Elsie Stephens Special Use Park - Phase II 1. Earthwork and final grading 2. Gravel and/or paved trails 3. Gravel and/or paved roadways 4. Concrete curbing 5. Pedestrian bridges and concrete abutments 6. Site furnishings 7. Landscape planting including trees, shrubs, and lawn/native seeding Work shall begin after June 6th, 2022 and be substantially completed by November 30th, 2022.

Bid Results

Playgrounds / Parks / Athletic Fields

$242,360.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
162
Bidding Soon
1,559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

June 6, 2022

Project location map

Multiple Locations, Dayton, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.