BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Ventura, California. Completed plans call for site work for a playground / park / athletic field; and power facility.

Award Details Contract Award Date: May 12, 2022 Contract Award Number: 140P8422P0030 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VZH8EXK37D28 Contractor Awarded Name: M4 BUILDERS Contractor Awarded Address: OJAI CA 93023-3536 US Base and All Options Value (Total Contract Value): $88170.16 COMMISSIONING TO BRING ON-LINE SOLAR PV SYSTEM WITH GENERATOR BACKUP ON SANTA ROSA ISLAND AT THE MAIN RANCH - ELECTRICAL SYSTEM BUILDING, CHANNEL ISLANDS NATIONAL PARK, VENTURA COUNTY, CA The National Park Service at Channel Islands National Park has a requirement for the commissioning of a PV System on Santa Rosa Island. The project site on Santa Rosa Island of Channels Islands National Park is located off the coast of California approximately 50 miles west from Ventura, CA. The work site is in the developed area referred to as the Main Ranch on the northeast section of Santa Rosa Island that is accessible by ocean going vessels and twin-engine aircraft capable of flying over open ocean and landing and taking off on a short unpaved runway. The work of this contract consists of supervision, labor, equipment, testing, and supplies required to perform the final commissioning services to bring the solar PV system with generator backup to full functionality, as identified in the project specifications and associated documents provided as attachments to the solicitation. The specifications list the necessary deficiency corrections that were identified during the post-construction commissioning phase. Per FAR 36.204, the estimated project price is between $25,000 and $100,000. The North American Industry Classification System (NAICS) Code for this requirement is 238210, with a corresponding size standard of $16.5 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Quotations are solicited only from small business concerns. Quotations received from concerns that are not small business concerns shall not be considered. The Government anticipates award of a firm-fixed-price purchase order resulting from this solicitation. Evaluation for award will be made in accordance with the simplified acquisition procedures outlined in FAR Part 13.106. The Government anticipates issuing an order resulting from this request for quotation to the responsible quoter whose quotation will be most advantageous to the Government, price and other factors considered (relevant experience, California contractor license, and past performance) as listed in Section M. A site visit has been scheduled for Tuesday, April 12, 2022. The site visit is an all-day trip to Santa Rosa Island via a park service boat. Advance RSVP is required to the Contracting Officer to reserve your space on the boat. Arrive at park headquarters at 7:00 a.m. Pacific Daylight Time the day of departure for check-in and safety briefings. See Section L for more information. QUOTATION MUST BE RECEIVED BY: 5:00 p.m. Pacific Daylight Time, Tuesday, April 19, 2022, and shall only be accepted through electronic mail addressed to alanna_gardner@nps.gov. Legacy Doc #: NPS Delivery: 07/12/2022 Delivery Location Code: 0009817553 NPS, CHANNEL ISLANDS NP 1901 SPINNAKER DRIVE VENTURA CA 93001 US Period of Performance: 05/23/2022 to 07/12/2022 00010 Commission PV System Product/Service Code: Z2MG Product/Service Description: REPAIR OR ALTERATION OF EPG FACILITIES - SOLAR Steven Geair is designated as the NPS Contracting Officer's Representative (COR) for this order and will be responsible for certifying receipt and acceptance of the services rendered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. a. Remove all existing solar panels from the site and legally dispose of outside of the Park. b. Demolish all infrastructure on the electrical equipment building roof down to the penetrations. Upon inspection, make a decision to either pull the L-feet from the roof, or simple leave in place and put down a fresh layer of polyurethane sealant over the penetrations. c. With the existing ground mount array, remove the existing solar panels and associated wire, but leave the vertical supports and pier attachments in place. i. Put a new layer of corrosion inhibitor on the pier attachment hardware. ii. Demolish all existing wire, conduit, combiner boxes, etc. iii. Drive a new ground rod at the array and attach to system ground. d. Install new solar array, utilizing government provided solar panels already on-site, on existing ground mount structure by leaving the existing vertical supports and associated ground attachment hardware in place. i. Install new Iron Ridge rail, horizontally, over the top of the existing vertical supports. ii. The new solar array will consist of 82 modules total. The modules on site are Solaria Power XT-355R-PD, for a total of 10.65 kW of power. iii. The array will be wired in parallel sets, feeding three FM80 Outback 150 VDC charge controllers located inside of the electrical equipment building Period of Performance: 05/23/2022 to 07/12/2022 MBE (21.5%), WBE (6.9%), SBE (100%)

Award

Playgrounds / Parks / Athletic Fields

$88,170.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
53
Bidding Soon
1,416
All Active Projects
605
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2022

May 23, 2022

img_map_placeholder

1901 Spinnaker Dr, Ventura, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.