BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Worthington, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Notice is hereby given that a public hearing will be held by the City of Worthington, Iowa on the proposed contract documents (plans, specifications, and form of contract) and estimated cost for the improvement at its meeting at 6:30, P.M. on April 18, 2022, in said City Hall, 216 1 st Avenue West, for the 2 nd Street NE HMA Resurfacing Project The extent of the work involved consists of reconstruction of spot curb & gutter replacement, Replacement of sanitary sewer manholes, HMA patching; HMA curb reveal milling; HMA overlay and miscellaneous related construction and appurtenances. The project includes work along 2 nd Street NE from 1 st Avenue SW northerly to the City Limits, approximately 1,500 feet. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount of 5% of the amount of the bid, as fixed in the Instruction to Bidders, and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. The work under the Contract shall be complete within 45 calendar days of contractor commencing work. Contractor has the option of two different completion dates: September 30, 2022 or June 1, 2023. Work commenced this calendar year shall be substantially complete by September 30, 2020. No unfinished work may be carried over the winter. Should the contractor fail to complete the work in this timeframe, liquidated damages of $1,000.00 per calendar day will be assessed for work not completed within the designated contract term. The City of Worthington, Iowa does hereby reserve the right to reject any or all bids and to waive informalities.

Bid Results

Roads / Highways

$157,606.00

Public - City

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
42
Bidding Soon
419
All Active Projects
206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2022

May 18, 2022

img_map_placeholder

2nd St NE, Worthington, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.