BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a civil project in Charlotte, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; and for the renovation of a water / sewer project.

Questions deadline is extended to May 2nd at 2:00 PM EST PC/Leeper joint venture has been selected by Charlotte Water as the construction manager for the Mallard Creek Water Reclamation Facility Phase 1 Improvements project in Charlotte, North Carolina. This project includes process air and liquid and solids process train improvements that will allow the facility to expand from its current 12-mgd capacity to 14.9 mgd. Liquid process train improvements include a new influent pumping station, new flow equalization facilities, new alkalinity storage and feed facilities, and plant drain piping improvements for centrate equalization. Work to the solids process train includes a new sludge screening facility and improvements to the primary sludge pumping station, solids handling building, dewatered cake storage pad, and digester sludge heating and biogas safety processes. PC/Leeper will work with engineers Brown and Caldwell and CDM Smith on this project. Construction is expected to begin in late 2022 with completion scheduled for January 2027. For questions please contact Melinda Lindsay PC-Leeper, A Joint Venture 7085 Old Plank Rd. Stanley, NC 28164 Headworks, EQ storage, chemical improvements, new screenings facilities, new influent pump station, solids handling improvements and odor control. PC/Leeper joint venture has been selected by Charlotte Water as the construction manager for the Mallard Creek Water Reclamation Facility Phase 1 Improvements project in Charlotte, North Carolina. This project includes process air and liquid and solids process train improvements that will allow the facility to expand from its current 12-mgd capacity to 14.9 mgd. Liquid process train improvements include a new influent pumping station, new flow equalization facilities, new alkalinity storage and feed facilities, and plant drain piping improvements for centrate equalization. Work to the solids process train includes a new sludge screening facility and improvements to the primary sludge pumping station, solids handling building, dewatered cake storage pad, and digester sludge heating and biogas safety processes. PC/Leeper will work with engineers Brown and Caldwell and CDM Smith on this project. Construction is expected to begin in late 2022 with completion scheduled for January 2027. Bid Results :: Bid Packages 2.01 :: Harper General Contractors :: $1,953,340 Bid Packages 2.02 :: Harper General Contractors :: $767,600.00 "Bid Packages 2.03 :: Ruby Collins, Inc.:: $321,890.00 "

Bid Results

Roads / Highways

$3,042,830.00

Public - City

Paving, Renovation, Site Work

1

4

28

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
31
Bidding Soon
1,032
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2022

July 20, 2022

img_map_placeholder

12400 US-29, Charlotte, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.