Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Forrest City, Arkansas. Completed plans call for the renovation of a water / sewer project.
The Project consists of rehabilitation (including equipment replacement) of three (3) existing clarifier mechanisms and three (3) existing multi-stage centrifugal blowers. 1. Aeration Blowers (3 Blowers) Replace three (3) multi-stage centrifugal blowers. Replace associated valves. Sand blast and paint associated ductile iron piping. Associated electrical. 2. Clarifiers (3 clarifiers) Clean out each clarifier. Complete replacement (or refurbishment) of mechanisms including rakes, weirs, baffles, gear-drives, walkways, and support structure. Replace corroded pressure relief valves in tanks. Furnish new FRP effluent launder covers. Associated electrical. The Project is located at the City of Forrest City Wastewater Treatment Plant located at 320 SFC 209, Forrest City, Arkansas 72335. Davis-Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. Addendums to the bid package will be issued through the Garver online Plan Holders List; therefore, all prime bidders shall be responsible for downloading the bid documents from the Garver online plan room in order to be included in the Plan Holders List. Bidders must enter the addenda numbers on the Bid Form to verify receipt. Bids shall be accompanied by a cashier's or certified check upon a national or state bank in an amount of five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within fifteen (15) days after notice of award of Contract to him. Such bid guarantee shall be made payable to City of Forrest City. The successful bidder must furnish a performance and payment bond upon the form provided in the amount of one hundred per cent (100%) of the contract price from an approved surety company holding a permit from the State of Arkansas to act as surety, or other surety or sureties acceptable to the Owner. Bids must remain in effect for 60 days after the bid opening date. Within 60 days from the bid date, the Owner may award the contract to the lowest responsive, responsible bidder or reject any or all bids for the project. City of Forrest City. reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of the City of Forrest City., and to reject nonconforming, nonresponsive, or conditional bids. Any contract or contracts awarded under this invitation for bids will be subject to the requirements of the Arkansas Revolving Loan Fund (RLF) Programs as described in the contract documents. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. Bidders on this work will be required to comply with the President's Executive Order 11246, as amended. The requirements for Bidders and Contractors under this order are explained in the specifications. Each Bidder must comply with the requirements, terms, and conditions of the Arkansas Natural Resources Commission, the Disadvantaged, Minority and Women Business Enterprise (DBE/MBE/WBE) requirements, the Consolidated Appropriations Act of 2014 (Public Law 113-76) including the "American Iron and Steel (AIS)" requirement, Labor Standards, Equal Employment Opportunity, and the "Prohibition on certain telecommunication and video surveillance services or equipment provisions" during the performance of this contract. The Bidder commits itself to the requirements for the participation contained herein and all other requirements, terms, and conditions of these bid conditions by submitting a properly signed Bid. Each requirement listed above for the RLF programs are in the Supplemental Conditions in the Contract Documents. Questions about the project shall be directed to: Garver, Attn: Paul Strickland P.E., 501-537-3408, JPStrickland@GarverUSA.com. Garver Project No.: 21W01620 Substantially Complete within 365 calendar days ; Final Completion within 395 calendar days
Post-Bid
Water / Sewer
$360,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2022
June 13, 2022
320 SFC 209, Forrest City, AR
Related To This Project
Forrest City, AR
Bid Date: Apr 21 2022
Forrest City, AR
Bid Date: May 18 2022
Forrest City, AR
Bid Date: May 17 2022
Forrest City, AR
Bid Date: Aug 11 2020
Forrest City, AR
Bid Date: May 07 2019
Forrest City, AR
Bid Date: Aug 02 2022
Forrest City, AR
Bid Date: Aug 08 2022
Forrest City, AR
Bid Date: Sep 15 2022
Forrest City, AR
Bid Date: Mar 01 2023
Fordyce, AR
Bid Date: Apr 19 2022
Little Rock, AR
Bid Date: May 17 2022
Little Rock, AR
Bid Date: Apr 05 2022
Lavaca, AR
Bid Date: Apr 12 2022
Malvern, AR
Bid Date: Apr 12 2022
Bentonville, AR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.