Published April 27, 2022 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Middletown, New York. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

CR Number: 2085518 Duration: 570 Days Small Business - 23% Women-owned small business 5% Small disadvantaged business 5% Service-disabled veteran-owned small business 3% Small business in a HUBZone 3% Phase II Contract 5 consists of specific flood risk management components. Specifically, the work entails the construction of a 2,036 foot floodwall and a segment of levee that will extend approximately 2,472 feet north from Broadway along the western edge of Compton Creek marsh to the Raritan/Sandy Hook Bay shoreline dune. In addition, the applicant proposes to elevate a 600 foot long section of Port Monmouth Road, a pump station, two drainage outlet structures, a drainage culvert and a drainage system comprised of a swale pipe and culvert along Braindard Avenue. The contractor shall begin performance within five calendar days and complete the project within 570 calendar days after receiving notice to proceed. The scope of work will include, but not be limited to: Division 01 - General Requirements Division 02 - Existing Conditions Division 03 - Concrete Division 04 - Masonry Division 05 - Metals Division 06 - Wood, Plastics, And Composites Division 07 - Thermal and Moisture Protection Division 08 - Openings Division 09 - Finishes Division 10 - Specialties Division 13 - Special Construction Division 22 - Plumbing Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) Division 25 - Integrated Automation Division 26 - Electrical Division 28 - Electronic Safety and Security Division 31 - Earthwork Division 32 - Exterior Improvements Division 33 - Utilities Division 35 - Waterway and Marine Construction Division 40 - Process Interconnections Subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. Buy American Act applies on this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$25,000,000.00

Public - Federal

Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Temporary Storm Water Pollution Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Chemical Sampling and Analysis of Soils, Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Metal Roof Panels, Flashing and Sheet Metal, Sheet Metal Roofing, Joint Protection, Preformed Joint Seals, Joint Gaskets, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Sump Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles, Bored Piles, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Lifts, Slings, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
445
Active Projects
256
Bidding Soon
4,274
All Active Projects
1,922
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

July 6, 2022

img_map_placeholder

Multiple Locations, Middletown, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Port Monmouth Hurricane and Storm Damage Reduction Project Phase II - Contract 5

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.