Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 22, 2022 at 8:00 PM
Updated October 24, 2023
This is a service / maintenance or supply contract in Minneapolis, Minnesota. Contact the soliciting agency for additional information.
Questions or Inquiries. All questions must be submitted via email April 20, 2022 by 5pm (CST) to: Curtis Schmillen at cschmillen@usbankstadium.com AND Jimmie Hodges at jhodges@usbankstadium.com Prevailing Wages. The Contractor shall pay the prevailing wage rates, prevailing hours of labor, and hourly basic rates of pay determined for this Project, and will incorporate into this Contract Agreement the applicable wage determinations for Contractor Work along with language from the commissioner of the state Department of Labor and Industry that will notify the Contractor and its Subcontractors of the applicability of Minn. Stat. 177.41 to 177.44 to this Project. The Contractor shall comply with prevailing wage requirements under Minn. Stat. 177.41 to 177.43 or as otherwise required by the Contract Documents or Applicable Laws. The Authority shall demand and the Trade Contractor and its Subcontractors shall furnish to the Authority copies of any or all payrolls no more than fourteen (14) Days after the end of each pay period and said payrolls must contain all the data required by Minn. Stat. 177.30. Contractor shall also utilize the an online labor tracking report if requested of the Authority. The Authority may also examine all records relating to wages paid to work to which Minn. Stat. 177.41 to 177.43 apply. Hiring, Training, and Supervision. Contractor shall be responsible for hiring, training, supervising, and directing its employees. Contractor will not by any statement, act or omission express or imply to any of its employees or job applicants that SMG is an employer, co-employer, or joint employer of such individuals. Contractor will compensate its own employees and comply with all applicable tax and other legal requirements for their employment. INSURANCE. Contractor shall obtain and maintain in force at all times during the term of this Agreement as a direct cost of operation, insurance coverage as indicated below. Such coverage will be obtained from an insurance company authorized and licensed to do business in the State of Minnesota with a Best's Insurance Reports rating of no less than A VIII. Such insurance shall, to the maximum extent permitted by Law, cover Contractor's Indemnification obligations pursuant to this Agreement, and all claims and suits of any kind whatsoever arising from the Services provided by Contractor. Should any required coverage be written with a self-insured retention or deductible, said self-insured retention or deductible shall be the sole responsibility of Contractor, and such insurance shall apply, as respects SMG, as if no such self-insured retention or deductible was in place; provided, however, such self-insured retention shall not exceed $25,000. Workers' Compensation and Employers Liability. Workers' Compensation and Employers Liability Coverage, as statutorily required by the State of Minnesota for all employees of Contractor. Employers' Liability coverage on the Workers Compensation policy shall be written in the minimum amount of $1,000,000.00. The Authority reserves the right to accept or reject any or all Proposals, to amend or alter the selection process in any way by addendum, to postpone the selection process for its own convenience at any time, and to waive any non-material defects in proposals submitted. Proposals are required to remain open and subject to acceptance until an award is finalized, or a minimum of (90) days following the date of submission of Proposals. The Authority also reserves the right to accept or reject any individual subconsultants that the successful Proposer proposes to use.
Post-Bid
Arenas / Stadiums
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 26, 2022
May 2, 2022
401 Chicago Ave, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Apr 29 2022
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Aug 27 2021
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Mar 04 2022
Minneapolis, MN
Bid Date: Mar 15 2022
Minneapolis, MN
Bid Date: May 06 2022
Minneapolis, MN
Bid Date: Feb 25 2022
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 11 2022
Minneapolis, MN
Bid Date: Mar 07 2022
Minneapolis, MN
Bid Date: Mar 02 2022
Minneapolis, MN
Bid Date: Apr 21 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed