Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and outdoor lighting for a transportation facility in Sparta, Michigan. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.
State Project #: 213242, 213243, 213244 The subject line for bid submittals shall include reference to the contract being bid, "Paul C. Miller - Sparta Airport Reconstruct Runway 7-25 Lighting, Signage, PAPIs, REIL, Taxiway Lighting, Windcone & Beacon Bid". All bid proposal documents shall be submitted in PDF format with a file size not to exceed 10MB. In the event that bidders are not able to submit their bid electronically, bidders shall be required to submit their bids to Prein&Newhof at 3355 Evergreen Drive NE, Grand Rapids, Michigan 49525. The deadline for questions is 5:00 pm (EST) on Tuesday, April 19, 2022. The project consists of furnishing all material and constructing the following: Removing and replacing approximately 160 airfield edge lights (LED), removing and replacing 2 sets of PAPIs (LED), 1 set of REILs (LED), removing and replacing the primary airport windcone (LED) including the concrete base, replacing the airport beacon with a new LED fixture on a new tower. The Bidder is to complete the Bid Proposal documents that are included in the Project Specification book (online or hard copy), referring to the table of contents to identify the exact order of these documents. Regardless of how the bid documents are received, a hard copy (paper copy) of the Bid Proposal Documents must be submitted for bidding purposes. The Bid Proposal Documents include all the items identified on the Bid Proposal Checklist. The Bidder must provide the signed Bid Proposal Documents in either type written or hand written (in ink) form and clearly and completely set forth all required lump sum amounts, unit prices or other costs in a legible and understandable manner. Illegibility of any work or figure in the proposal may be sufficient cause for rejection of the proposal by the Owners. Any conclusions or information obtained or derived from Contract Documents will be at the user's sole risk. Prein&Newhof will maintain in its Grand Rapids office the master copy (hard copy) of the Contract Documents from which all electronic copies are based. In the case of any contract discrepancy, the Master Copy (hard copy) shall be considered the controlling document. The work to be performed under this contract will be financed and paid for by funds received from Federal, State, and Local sources. A bid bond, certified check, or cashier's check payable Village of Sparta in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of ninety (90) days after the receipt of bids. The DBE goal is TBD for this contract. The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least ninety (90) days thereafter. The project shall be completed within ninety (90) days from date of Notice to Proceed.
Award
Transportation Terminals
$787,190.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2022
September 14, 2022
9100 Vinton Ave NW, Sparta, MI
Related To This Project
Sparta, MI
Bid Date: Sep 02 2022
Sparta, MI
Bid Date: Apr 25 2023
Sparta, MI
Bid Date: Oct 19 2021
Sparta, MI
Bid Date: Oct 14 2021
Sparta, MI
Bid Date: Jul 30 2020
Sparta, MI
Bid Date: Nov 09 2023
Sparta, MI
Bid Date: Nov 13 2023
Sparta, MI
Bid Date: Dec 21 2023
Sparta, MI
Bid Date: May 05 2022
Sparta, MI
Bid Date: Feb 25 2021
Sparta, MI
Bid Date: Oct 06 2020
Sparta, MI
Bid Date: Aug 01 2019
Sparta, MI
Bid Date: Apr 25 2019
Sparta, MI
Bid Date: Nov 22 2022
Sparta, MI
Bid Date: Nov 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.